Interim Deficiency Rept DER 82-80 Re Conax Electrical Penetration Low Insulation Resistance Not Meeting Test Requirement.Initially Reported on 821217.Next Rept Will Be Submitted by 840612
ML20084J327
Person / Time
Site: Palo Verde  
Issue date: 04/24/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29351-BSK, DER-82-80, NUDOCS 8405090075
Download: ML20084J327 (2)


Text

.

alcEWED l'3" Arizona Public Service Company 1533 !?C 27 Hi D 67 UEGh? O April 24,1984 ANPP-29351-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 82-80 A 50.55(e) Potentially Reportable Deficiency Relating To Installed Conax Electrical Eenetration Low Insulation Resistance Does Not Meet Qualification Test File:

84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between T. Young and G. Duckworth on December 17, 1982 (B) ANPP-22736, dated January 17, 1983 (Interim Report)

(C) ANPP-23642, dated May 3, 1983 (Time Extension)

(D) ANPP-27619, dated Augus t 23, 1983 (Time Extension)

(E) ANPP-28539, dated January 3, 1984 (Interim Report)

(F) ANPP-28933, dated February 24,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), Interim Reports were transmitted by References (B) and (E), and Time Extensions were requested by References (C), (D) and (F).

At that time, it was estimated that a Final Report would be available by April 25,1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by June 12, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours

.=

L-L, Q1 G LLL 8405090075 840424 E. E. Van Brunt. Jr.

int ADOCK 05000 2 APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc:

See Page Two

./47-it7L i

9 i

4"

~

  • s
C Mr. T. W. Bishop DER 82-80 Page Two

..t c F

cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission i

ji Washington, D. C. 20555 T. G. Woods, Jr.

D. B.~Karner l'

W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza D. E. Fowler o

J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 l

- _ _ _ _ _.