ML20084H852
| ML20084H852 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/15/1974 |
| From: | Green H TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20084H846 | List: |
| References | |
| AO-BFAO-7423T, NUDOCS 8305060028 | |
| Download: ML20084H852 (2) | |
Text
_ _ _ _ _ _ _
'dWg "
i,y.QAffQg.g f']*
Qi W';SMsisti QkQpg,y,hp23 E
.. Usj&,hy$hdias;Ihbdhfbhk K
0
=
vhb k' f*N k h$bkbbhbi rh 28N M Idb ef 3
TBA274(1445)(2-020063E105)PD 04/15/74 1445 a
2057298316 TDBN ATHENS AL 103 04-15 0245P EDT FON 4045264503 3
US ATOMIC ENERGY COMMISSION REGION 2 DIRECT 0P ATE OF REGULATORY OPER ATIONS 230 PEACHTREE ST NOPTHWEST M EIE 3
i ATLANTA G A 30303
~
BFAO-7423T THE HPCI SYSTEMS FAILED TO MEET ITS ST ART TIME REQUIREMENT 3
DURING PERFORMANCE OF A POST MAINTENANCE SURVEILL ANCE TEST AT APPROXIMATELY 930AM ON 4-14-74 THE REACTOR WAS IN THE PROCESS 0F STARTING UP AND WAS AT R ATED TEMPERATURE AND PRESSURE AND O
APPROXIMATELY 10 PERCENT POWER LEVEL THE HPCI REACHED R ATED p
SLOW IN 27.5 SECONDS VERSUS REQUIRED TIME OF LESS THAN 25 SECONDS THE SYSTEMS HAD PREVIOUSLY MET ALL REQUIREMENTS WHEN TESTED O
I WITH AUXILI ARY STEAM PRIOR TO START UP AND WHEN TESTED WITH r.imi im.-
O REACTOR STEAM AT THE 150 PSIG LEVEL HPCI W AS RETURNED TO SERVICE O
AT 710PM FOLLOWING SATISFACTORY TESTING THE SAME DAY d
H J GREEN BROWNS FERRY NUCLEAR PLANT O
NNNN d
O
-w\\
( ' ' l _,
y :3 9
- ,n
\\. J/ y,', I O
^ [,5
/3,'..,
- G' ',5'
~ DOPY SEIT T0: PDR O
LPDR '
' ' l i,q ;j ' '
i NSIC
\\, ',,',f.[
n TIC
, n.. s.
)g 0
i 1,
s
' ri /0 O
~~
r.imi guen j
1 0305060020 740423 s
PUR ADOCK 050002S9 l-S PDR w
o O
/
Telegram from Tennessee Valley Authority,!!. J. Green, APR 3 01974 dated April 15. 1974 259 DISTRIBUTION:
!!. D. Thornburg (2)
BOstlQ (5)
DR Central Files Regulatory Standards (3)
Directorate of Licensing (13)
PDR t
Local PDR NSIC OIS, OR State Q
n Fr; m$
3' c:
3
'5 p
,in N
n r,,C O
c-45 G
G E2 s
Rc,Q
<a m;c o>