Suppls Response to IE Bulletin 83-06, Nonconforming Matls Supplied by Tube-Line Corp. Two Flanges Installed in Boric Acid Sys & Containment Spray Sys.Util Replaced Three Other Flanges as Committed
ML20084H727
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/04/1984
From: Barnes P
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
7840N, IEB-83-06, IEB-83-6, NUDOCS 8405080173
Download: ML20084H727 (2)


Text

'D. Commonwealth Edison e

^ ) One First Nitional Plata. Chicago. libnoq

' 7 Address Reply to: Post Ofhce Box 767 xy' Chicago. Ilknois 60690 May 4, 1984 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Braidwood Station Units 1 and 2 Supplemental Response to IE Bulletin 83-06,

" Nonconforming Materials Supplied By Tubeline Corp.'-

NRC Docket Nos. 50-456/457 References (a):

IE Bulletin No. 83 R. C. DeYoung letter to All OLs and cps dated July 22, 1983 (NL-83-0034)

(b):

P. L.

Barnes to J. G. Keppler letter dated November 17, 1983 (NL-83-0550)

(c):

P. L. Barnes to J. G. Keppler letter dated December 20, 1983 (NL-83-0701)

Dear Mr. Keppler:

Reference (a) requested that the Commonwealth Edison Company provide a written report regarding nonconforming materials supplied by Tube Line Corporation.

References (b) and (c) provided that report.

In Reference (b) we identified four 3-inch 150 pound RF W/N Flanges supplied to Braidwood by Joliet Valve Co. through the Phillips Getschow Company.

Two of these flanges were installed in the Boric Acid System and two were installed in-the Containment Spray System.

One of the Containment Spray System flanges had been replaced at the time of our Reference (b) submittal.

We also committed to replace the other three flanges.

These flanges have been replaced.

8405080173 840504

~

/

PDR ADOCK 05000456

/

G PDR g

1

.s

. ]

To the best of my knowledge and belief the statements i.

contained in the Attachment are true and correct.

In some respects these statements are not based.on my personal knowledge but upon information furnished by other Commonwealth Edison employees, consultants and contractors.

Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

4 Please address any questicns that you or your staff may have concerning our response to IE Bulletin No. 83-06 to this office.

One (1) signed original with Attachment is being sent directly to the USNRC Document Control Desk in Washington, DC for i

reproduction and distribution as requested in the Bulletin.

l Respectfully, h~lsvup i

P. L. Barnes Nuclear Licensing Administrator Attachments cc:

U.S. NRC, Document Control DeskL/

Washington, DC 20555 RIII Inspectors - BW SUBSCRIBED and SWORN to before me this u M day of On av