ML20084H720
| ML20084H720 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 05/15/1974 |
| From: | Green H TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20084H719 | List: |
| References | |
| AO-BFAO-7432T, NUDOCS 8305040787 | |
| Download: ML20084H720 (1) | |
Text
!
4 pts cosa, 3505/15/h
-]
2-36 90 A p* h I-1 fwds u
, A ICS IPHRNGZ CSP LUU5feIn Uniun d CJ U ! n =n :
2057200316 MGM TOBN ATHENS AL 100 05-15 Oc55P EDT
- C..'
ZIP 30303 O
.)
US ATOMIC ENERGY COMMISSION REGION 2 DIRECTORATE OF
')
NORTHWEST REGULATORY OPERATIONS 230 PEACHTREE ST ATLANTA GA 30303
')
~)
BFAO=7432T UNIT 2 TURBINE BUILDING EXHAUST FANS OPERATED O
APPROXIMATEL Y 16 DAYS WITHOUT CONTINUGUS AIR MONITORING. ON MAY to 1974 THE UNIT 2 TURBINE BUILDING EXCHAUST VENT CONTINUOUS AIR MONITORS
]
2-RM-90-249 AND 251 WERE FOUND INOPERABLE A VENDER ASSEMBLY ERROR CAUSED THE AIR SAMPLE TO BYPASS ALL RADIATION DETECTORS SUCH THAT THE SAMPLE WAS NOT HONITORED UNIT 1 REACTOR WAS IN O
THE COLD SHUT DOWN CONDITION AND UNIT 2 WAS IN PREPARATION FOR INITIAL FUEL LOADING H J GREEN BROWNS FERRY NUCLEAR PLANT
')
16:56 EDT MGMATLT HS8
)
^
3 3
J J
)
8305040787 740524 PDR ADDCK 05000259 S
-)
)
)