Responds to IE Bulletin 83-06 Re Nonconforming Matls Supplied by Tube-Line Corp.Bulk Purchasing Documents Identified Six 12-inch,Schedule 40S,150 Lb Raised Face,Weld Neck,Asme SA 182 Type F304 Flanges Purchased from Gulfalloy
ML20084H710
Person / Time
Site: Comanche Peak  
Issue date: 12/29/1983
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-83-06, IEB-83-6, TXX-#4080, NUDOCS 8405080165
Download: ML20084H710 (3)


Text

.

TEXAS UTII.ITIES GENERATING CO.TIInNY EKX)I IG4YAN 1Y)WEI4 a t)AI.I.AN,TEXA8 75201 R. J. GARY "llTa'..*L'.'.:',1L'?

^

TXX #4080 1

File No. 10130 p

OEC 29 EB I

December 29, 1983 L

Mr. John T. Collins Regional Administrator USNRC Division of Inspection and En forcement, Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

Subject:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 RESPONSE TO IE BULLETIN 83-06 l> ear Mr. Collins:

The following information is provided as di: ected by Action 4b of IE Bulletin 83-06.

Action 2a - Provide a list of Tube-Line Corporation supplied materials and identify the systems in which those materials are/will be installed.

A review of bulk purchasing documents identified six (6) each 12", schedule 40s, 150 pound raised face, weld neck, ASME SA 182 type F304 flanges which were purchased from Gulfalloy, Inc. This material was supplied to Gulfalloy by Tube-Line and all six flanges were purchased as ASME Code Class 2.

These flanges are installed in the following systems:

1) Two (2) each installed in Unit 2 Containment Hydrogen Purge Exhaust System, ASME Code Class 2 piping.
2) Two (2) each installed in Common Unit Containment Hydrogen Purg'e Exhaust System, ASME Code Class 3 piping.
3) Two (2) each installed in Common Unit Containment Hydrogen Purge Supply System, Non-Nuclear Safety piping.

8405080165 831229 0

PM 7h}l PDet ADOCK 05000445 y

,\\.

Mr. John T. Collins Page 2 To date, no additional Tube-Line supplied material has been identified at j

CPSES. However, five vendors identified in the attachments to the bulletin i

have supplied equipment at CPSES. Letters have been written to these vendors requesting a listing of any material supplied which has any Tube-Line material associated with it.

The responses to these letters will be eve luated to determine the appropriate disposition of any Tube-Line materials n

and supplemental responses to this bulletin will be made as necessary.

Tube-Line Corporation, itself, is not on the Texas Utilities approved vendor list and as such cannot serve as a direct supplier of qualified materials to CPSES. All receipt inspectors have been directed to place on hold any incoming equipment found to utilize material supplied to the vendor by Tube-Line Corporation.

Action 2b - Implement a program which provides assurance that received materials comply with ASME Code Section III and applicable procurement specification requirements, or which demonstrates that such materials are suitable for intended service. This program should include specific verification that received austenitic stainless steels are in a nonsensitized condition.

Texas Utilities received from Tube-Line a Certificate of Conformance to the ASME code requirements for the six flanges purchased from Culfalloy.

In response to inquiries made by TU subsequent to the receipt of this bulletin, copies of a heat trace chart, traceable to the flange material, were furnished to TU by Tube-Line through Culfalloy.

However, TUCCO QA has been unable to solicit from Tube-Line copies of documentation sufficient to establish conformance by the Tube-Line materials supplier with the requirements of the ASME code.

Action 2c - Meplace fittings and flanges with materials which have b(en manufactured in full compliance with ASME Code Section III and the applicable procurcrent specification requirements.

Texas Utilities will procure four (4), 12", ASME SA 182 type F304 stainless steel ASME Code Class 2 flanges. Af ter these flanges are delivered, TU will rer.ove and replace the four (4) flanges in the safety-relat.-d piping systems indicated under Action:2a, Items (1) and (2). 1Diis action will be completed prior to Unit 1 fuel load.

Approximately 200 manhours of utility staff time were expended to perform the requested inspections and evaluations required by this bulletin'.

Should you have additional questions concerning this matter, please contact this office.

4

r 1

Mr. John T. Collins Page 3 To the beet of my knowledge, information, and belief the matters set forth herein are true and correct.

Sincerely, a

  1. .'Cary Ex cutive V ce President and General Manager RJG:cp c:

U.S. Nuclear Regulatory Connission Document Control Desk Washington,'DC 20555 Subscribed and sworn t before me, Nota y Public in and for-County, on this d 9/

day of

^(1983.

N Notary Public 6 My corraission expires C S9

, 198_C

,x s i,.,c n w m a so isr Cai'as Ccor t). Td89t

.;y cc mmiaca upscr Octobct ?).db t

e

=

1