Interim Deficiency Rept Re Weld Yoke to Motor Mounting Plate FCV-74-58.Initially Reported on 740514.Yoke Broke from Operator at Yoke to Motor Base Welds.Investigation Continuing to Determine Exact Cause & Corrective Action
ML20084H706
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/14/1974
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: Knuth D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084H694 List:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8305040763
Download: ML20084H706 (1)


Text

......,_.__..m...

m J

.{ j r

~

i b TENNESSEE VALLEY AUTHOAITY i

~j CHATTANOOGA, TENNESSEE 37401 1

4,y,y,0,,,,y J

June 14, 1974 j

h os= peopte iN PARTNERSHIP

-l d

~ ]

Mr. Donald F. Knuth, Director j

Directorate of Regulatory Operations

) p ) b g c7 j

U.S. Atomic Energy Commission Washington, DC 20545 i

Dear Mr. Knuth:

Initial report of a potential design deficiency involving weld yoke-to-motor mounting plate FCV-74-58 at Browns Ferry Nuclear Plant units 2 and 3 was made on May 14, 1974.

In accordance with paragraph 50.55(e) of 10 CFR 50, this is submitted as an interim report.

During an outage of unit 1, MOV l-FCV-74-58 failed to operate properly. An investigation revealed the yoke broke from i

the operator at the yoke-to-motor base welds. This was reported to W. S. Little, AEC-DRO, by telephone on May 14, 1974, as i

a potential design deficiency with respect to Browns Ferry l

units 2 and 3.

l Further investigation is under way to determine the exact cause of the apparent failure and corrective action required.

j We expect to furnish a final report of this deficiency by July 12, 1974.

Very truly yours, AJ,E.Gilleland Assistant to the Manager of Power l

CC:

Mr. Norman C. Moseley, Director l

Directorate of Regulatory Operations U.S. Atomic Energy Commission l

t Region II - Suite 818 230 Peachtree Street, NW.

j Atlanta, Georgia 30303 l.

O[hp 4 1756 Ph r

4 n

4

..,m.y

+