e uauq It UNITED STATES ee NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 20666-0001
%Q.....,$
ENTERGY OPERATIONS. INC.
SYSTEM ENERGY RESOURCES. INC.
50l1TH MISSISSIPPI ELECTRIC POWER ASSOCIATION MISSISSIPPI POWER AND LIGHT COMPANY DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.122 License No. NPF-29 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment by Entergy Operations, Inc. (the licensee) dated June 25, 1993, as supplemented by letter dated April 13, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9506050300 950523 PDR ADOCK 05000122 P
4 2.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-29 is hereby amended to read as follows:
(2) Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.122, are hereby incorporated into this license.
Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION M
Paul W. O'Connor, Senior Project Manager Project Directorate IV-1 Division of Recctor Projects - III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 22, 1995
ATTACHMENT TO LICENSE AMENDMENT NO.122 FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
REMOVE PAGES INSERT PAGES 1
3.6-25 3.6-25 3.6-26 3.6-26 8 3.6-46 B 3.6-46
(
i l
l I
1 1
MSIV LCS 3.6.1.9 3.6 CONTAINMENT SYSTEMS 3.6.1.9 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
LCO 3.6.1.9 Two MSIV LCS subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One MSIV LCS subsystem A.1 Restore MSIV LCS 30 days inoperable.
subsystem to OPERABLE status.
B.
Two MSIV LCS B.1 Restore one MSIV LCS 7 days subsystems inoperable.
subsystem to OPERABLE status.
C.
Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AND C.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.9.1 Operate each outboard MSIV LCS blower 31 days l
2 15 minutes.
(continued)
GRAND GULF 3.6-25 Amendment No. 120,122
MSIV LCS 3.6.1.9 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY s
SR 3.6.1.9.2 Deleted not applicable l
SR 3.6.1.9.3 Perform a system functional test of each 18 months MSIV LCS subsystem.
f i
t l
\\
GRAND GULF 3.6-26 Amendment No. 420,122
- -. -. - _=- -..
MSIV LCS B 3.6.1.9 BASES ACTIONS C.1 and C.2 (continued)
If the MSIV LCS subsystem cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full' l
power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.6.1.9.1 REQUIREMENTS Each outboard MSIV LCS blower is operated for 215 minutes l
1 to verify OPERABILITY. The 31 day Frequency was developed i
considering the known reliability of the LCS blower and controls, the two subsystem redundancy, and the low probability of a significant degradation of the MSIV LCS subsystem occurring between surveillances and has been shown to be acceptable through operating experience.
l i
SR 3.6.1.9.2 Deleted l
SR 3.6.1.9.3 A system functional test is performed to ensure that the t
MSIV LCS will operate through its operating sequence.
This includes verifying that the automatic positioning of the valves and the operation of each interlock and timer are correct, that the blowers start and develop the required flow rate and the necessary vacuum, and the upstream heaters meet current or wattage draw requirements (if not used to verify electrical continuity in SR 3.6.1.9.2).
The 18 month (continued) i GRAND GULF B 3.6-46 Revision No. 0 Amendment No. 122
.