ML20084G724

From kanterella
Jump to navigation Jump to search
Advises That Insp of Unit 3 Torus Will Take Place During First Refueling Outage,Scheduled for Fall 1973
ML20084G724
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/06/1972
From: Stiede W
COMMONWEALTH EDISON CO.
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084G655 List:
References
1919, NUDOCS 8304220238
Download: ML20084G724 (1)


Text

,---

p) g 50-237

,3* - 30-249 C\ n 4 . n

,E UOmmO1T/7ealth E,dison company ONE FIRST NATBONAL PLAZA

  • CHECAGO, SLLSNoiS

,u,....,,,.,

POST OFFICE BOX 747

  • C H I C A G O, 8LLINOl$ 40490 -

g, gtL

y ,m April 6, 1972 ,,('[

w

]b- <.346! 0 UJdt' Mr. Roger S. Boyd, Assistant Director for Boiling Water Reactors h,:,

D,/k Division of Reactor Licensing dil #

U.S. Atomic Energy Commission Washingten, D.C. 20545

Subject:

Inspection and Structural Capability of the Dresden Units 2 and 3 Tori

Dear Mr. Boyd:

In a letter to you dated March 24, 1972 we

[

indicated that an inspection of the piping supports and baffles in the Dresden Unit 3 torus was scheduled for January 1973. This information was erroneous.

The inspection of the Dresden Unit 3 torus will take place during the first refueling outage for Dresden Unit 3. At the present time, this outage is scheduled to occur in the fall of 1973.

Should you require any additional information, please let me know.

Very truly yours,

'i  ;

{l5 &y,, c Jt U-shv1 b ~/

WayneL . Stiede i

Nuclear Licensing Administrator e

i 2kY h j$"}

1919 8304220238 730716 DR ADOCK 05000 i COPY SEN1 REGION N

_