ML20084F820

From kanterella
Jump to navigation Jump to search
Supplemental Deficiency Rept Re IEEE 383 Failure in Class IE Circuit Wiring in Standby Diesel Generator Sys Supplied by Tdi.Installation of Replacement Cable Expected to Be Complete by 840419
ML20084F820
Person / Time
Site: Perry  
Issue date: 03/23/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-63(82), NUDOCS 8405040323
Download: ML20084F820 (1)


Text

D@

T H E C L E V E L A N D E L E C T R I C I L L U ffii N AT I N G C 0 !ii P A N Y P.o. box 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation March 23,1984 MURRAY R. EDELMAN VICE PRESIDENT NUC LE A R Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Standby Diesel Generators DSRV16 Potential Defect Concerning IEEE 383 Failure in Certain Class 1E Circuits

[RDC 63(82)]

Dear Mr. Keppler:

Our letter to you dated January 30, 1984, concerning the potential defect associated with the IEEE 383 failure in certain Class IE circuit wiring in the standby diesel generator system supplied by Transamerica Delaval, Inc. stated that the installation of the replacement cable was expected to be completed by March 16, 1984. The installation is now scheduled to be completed by April 19, 1984, due to resolution of concerns related to field installation.

Please call if th<.re are any additional questions.

Sincerely, S

Murray R. Edelman Vice President Nuclear Group MRE:pab cc:

Mr. M. L. Gildner NRC Site Of fice Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.

20555 Y'p t " g@

Records Center, SEE~IN Institute of Nuclear Power Operations 1100 Circic 75 Parkway, Suite 1500 q

Atlanta, Georgia 30339 I

8405040323 840323 PDR ADOCK 05000440

}

S PDR