ML20084F484

From kanterella
Jump to navigation Jump to search
Forwards Summary Update of Electrical & Mechanical Seismic Qualification of Equipment.Specific Details Re Seismic Qualification Status for Each Piece of Equipment Available on Request
ML20084F484
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/30/1984
From: Herborn D
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
0982-L, 982-L, L30-84(04-30)-L, L30-84(4-30)-L, U-0707, U-707, NUDOCS 8405040165
Download: ML20084F484 (2)


Text

'

e

, U-0707 0 0982-L L30-84 (Oi -3 0 )-L

/LLINDIS POWER COMPANY CLINTON POWER STATION. P.o. BOX 678, CLINTON, ILLINOIS 61727 April 30, 1984 Docket No. 50-461 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Clinton Power Station Unit 1 Seismic Qualification of Equipment

Dear Mr. Schwencer:

As referenced in the Clinton SSER 2, at- .;hment 1 is submitted and constitutes a summary update to information previously forwarded by the Illinois Power letter dated July 20, 19.83 (refer U-0653). Specific details concerning seismic qualification status for each piece of equipn.cnt are available in preliminary form, and will be provided upon request.

Of the 9,446 pieces of equipment which require seismic qualification, 4356 are qualified and 901 are installed. Expressed as a percentage, these numbers translate into approximately 46% and 9.5% respectively.

Current schedule projections based on documentation received indicate achievement of the 85% equipment qualified rate on or before May 1985.

Substantial improvement in the installation complete status is anticipated in the near term based on cable pulling and terminations which will complete many equipment installations. Illinois Power anticipates achievement of 85% qualified and installed criteria and preparedness for an NRC SQRT audit by July,1985.

Should you have any questions concerning this submittal, please contact me or M. E. D' Haem (217) 935-8881 Ext. 303.

Sincerely yours, AalM Daniel I. Herborn Director - Nuclear Licensing and Configuration Nuclear Station Engineering Attachments GEW/ lam cc: C. A. Harrison, NRC Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety I(8 1 I

I A. J. H. Lee, NRC E0B B405040165 840430 PDR ADOCK 05000461 A PpR

' U-0707 0 0982-L L30-84 ( 04- 30)-L Attachment 1

-Summary-ELECTRICAL AND MECHANICAL SEISMIC QUALIFICATION i

TOTAL

  • NUMBER **

ITEMS QUALIFIED

NSSS Mechanical and Electric 3199 502 f

I BOP Mechanical and Electrical 6247 3854 TOTAL 9446 4356 PERCENT EQUIPMENT QUALIFIED: 46%

  • Total Items: Of the 9446 items which require seismic qualifications, the seismic reports for 8879 have been received by the architect-engineer and are in various stages )

of review. Expressed as a percentage, 94% of required seismic reports have been received from suppliers.

    • Number Qualified: Equipment identified in this category has been seismically qualified as attested to by qualification l binders which have been assembled, reviewed and approved by the architect-engineer.

_ _ _ _ . _ _ . -.