Melling Adairess Alabama Power Company 600 North 18th Street Post Offica Box 2641
. Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton. Jr.
Senior Vice President Alabar11aNwer Flintridge Building the southern electric system November 4, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing items Requesting NRC Approval Gentlemen:
Attached for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13, 1983. This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval.
Each updated or revised item is identified by a sideline in the margin.
New outstanding items identified since January 13, 1983 are included in the attachment supplement.
If you have any questions, please advise.
Yours truly,
(
F.
. Clayton, FLCJr/GGY:grs-D39 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Dr. I. L. Myers
\\
8311150291 831104 PDR ADOCK 05000348 3
R PDR y )
c.
bc:
Mr. W. O. Whitt Mr. R. P. Mcdonald -
Mr. H. O. Thrash-Mr. O. D. Ki ngsley, Jr.
Mr. W. G. Hairston, III Mr. J. W. McGowan Mr. C. D. Nesbitt Mr. R. G. Berryhill Mr. D. E. Mansfield
__lg" Mr. J. A. Ripple Mr. W. G. Ware Mr. L. B. Long Mr. J. R. Crane Mr. K. C. Gandhi Reference Listing i
v f
I
r Page 1 ATTA0 K NT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL NOVEleER 4, 1983 PRWOSED ACIUAL RESESTED ACRIAL
- Co MCo mC mC SABETTM. SABETTM. MTROWAL #FRDWAL TAC ITEM DATE DATE DATE DATE 10.
REMWKS
- 1. Movable Contml Rod 02-22-83 03-04-8 07-15-83
- Co 49951 fPC denied Assenblies for FtP 1 and 2 06-03.-83 11-01-83 r==ctM 49952 request (T.S.3/4.1.3) 07-28-83 date past 09-21-83; 07-28-83 due APCo 10-10-83 subnitted clarification on 10-10-83.
- 2. Charcoal Filters for FtP 1 03-01-83 03-04-83 09-01-83 APCo 49953 tbte 1 and 2 (T.S. 4.7.7, 4.7.8 and r==ctM 49954 4.9.14) date past *e
- 3. River Water Systen for FtP 1 N/A 12-30-82 07-01-83 MCo 49374 and 2 (T.S. 3/4.7.5) rupested 49375 date past de
- 4. Diesel Generator Overload N/A 03-03-82 07-01-83 APCo 49374 Test for FrP 1 and 2 (T.S.
12-30-82 10-01-83 r==ctM 49375 4.8.1.1.2.c.5) 06-03-83 date past l
due
- 5. BIT Reductim for FtP 1 and N/A 12-30-82 03-31-83 03-15-83 N/A COWLETE 2(T.S.3/4.5.4) 03-04-83 03-18-83
- 6. Turtine Valve Surveillance N/A 10-0&82 12-01-83 KCo 48973 Unit 1 added for FtP 1 and 2 (T.S.
12-10-82 11-01-83 r==ctM to T.S.
l 3/4.3.4) 01-1&83 date past mquest 05-31-83 due 10-06-8
- 7. RCS Pressum Isolation N/A 08-10-82 07-01-83 Denied N/A COWLETE
~
^
Valves for FfP 1 and 2 12-23-82 09-08-83 (T.S. 3/4.4.7.2 and
-f 3/4.4.7.3) Pennanent T.S.
Reqmst l
t
- 1. The 30 day Federal Register notification rapirenent of 10CFR50.91 has delayed PRC appmval tvand APCo mquested date.
l
Page 2 ATTACl#OIT STATUS OF LICENSING ITEMS REQUIRING 15tC APPROVAL NOVDBER 4, 1983 PRWOSED ACRK DFQF9H)
ACilR AFCo MCo NtC lGC SIMITTM. SlMITTAL M9RDWAL APFROVAL TAC IIDI DATE IRTE DATE DME
- 70. RD9RKS
- 8. Itchanical Snubber N/A 11 8 12-01-82 01-31-83 N/A COWLETE Fulctional Test Exenption for FNP 1 (T.S.4.7.9.e)
- 9. Waste Gas Hydmgen/0xygen 02-01-84 08-01-84 Analyzer for FNP 1 and 2 (T.S. Table 4.3-9)
- 10. ISI/IST Licensing Pmgran
- a. Unit 1 Inservice Inspection (ISI) Pmgran for ASE Code Class 1, 2 and 3 Cuwrents
- 1) Relief Requests on N/A 04-17-81 09-01-8 08-24-83 N/A C0WLETE vessel cladding 01-10-83 examinations
- 2) Relief Requests on 01-18-8 01-28-83 09-01-83 MCo 49547 hydmstatic test mquested requirenents date past due
- b. Unit 2 Inservice Inspection (ISI) Pmgran for ASE Code Class 1,2 and 3 Cm ponents
- 1) Revision 0 Relief N/A 07-25-80 09-01-83 09-22-83 N/A COWLETE Requests..
06-20-83
- 2) Relief Requests on N/A 01-10-83 09-01-83 08-24-83 N/A C0WETE vessel tladding 06-20-83 exaninations h[
- 3) Relief' Request on 01-1 8-8 01 8 09-01-83 09-22-83 N/A COWLETE hyfmstatic test 06-20-83 f,
/,
mquirenents
/
~7
+
f
"", +, _
f A
f t'
9 "g
~
g-
- ,. y
~
'~*
I
,/
- l' g
/s
~
4L
Page 3 ATTA09ENT STATUS OF LICENSING ITEMS REQUIRING IRC APPROVAL NOVEMER 4, 1983 FR@0 SED ERML REQESTED EIURL APCo
REl#RKS
- c. Unit 1 Inservice Testing (IST) Program for A9E Code Class 1, 2 and 3 Conponents
- 1) Revision 2 Relief N/A 01-21-80 03-15-83 05-02-83 N/A COWLETE Requests See Iten 10, Page 2 of Supplenent
- 2) Revision 3 Relief N/A 07-16-81 03-15-83 05-02-83 N/A CGPLETE Requests See Item 10, Page 2 of Supplement
- 3) Revision 4 Relief N/A 10-25-82 03-15-83 05-02-83 N/A COWLETE Requests See Item 10, Page 2 of Supplerent
- d. Unit 2 Inservice Testing (IST) Pmgran for ASE Code Class 1,2 and 3 Conponents
- 1) Revision 0 Relief N/A 03-12-80 02-15-83 04-08-83 N/A C0WLETE Requests 06-20-83 See Item 10, Page 2 of Supplerent
- 2) Revision 1 Relief N/A 03-17-82 02-15-83 01-08-83 N/A CDPLETE Requests 06-20-83 See Iten 10, Page 2 of SuppleTent
- 3) Revision 2 Relief N/A 08-06-82 02-15-83 04-08-83 N/A C0fLETE Requests 06-20-83 See Iten 10, Page 2 of Supplanent
Page 4 ATTAC}# g g STATUS OF LICENSING ITEMS REQUIRING PRC APPROVAL NOVEL 6ER 4, 1983 PR@0 SED ACRML RESESB ACIM.
Apco APco mc mC SDGTTAL SAMITTAL APPRDWAL APPROWAL TAC IHM MIE _
M1E,
MTE MIE M).
RENRKS
- 12. Change 18 lbnth Interval to 04-01-0 04-05-8 10-01-83 Denied N/A COWLETE Refueling 08-22-83
- 13. ftteorological Tower 02-01-83 01-24-83 08-01-83 Denied N/A C0WLETE Surveillance for FNP 1 and 2 10-21-83 (T.S.3/4.3.3.4)
- 14. In-Com Thirrbles for FNP 1 N/A N/A N/A N/A N/A Requires no and2(T.S.3.3.3.2)
EC action
- 15. Safety Evaluations for Next Fuel Reloads:
- a. Unit 1 Upflow N/A 08-16-82 N/A N/A N/A Requires no ftdification M C action
- b. Unit 1 Cycle 5 03-14-83 03-17-83 N/A N/A N/A Requims no E C action
- c. Unit 2 Cycle 318 ftnth 09-01-83 09-02-83 N/A N/A N/A Requims no Fuel Cycle EC action
- 16. F delta H and Positive 10-15-83 10-13-83 01-10-84 ftderator Tenperatum Coefficient
- 17. Containnent Spray N/A N/A N/A N/A N/A Requires no E C action
- 18. Technical Specification 07-01-84 Optimization-Westinghouse 0mers Group
- 19. Safety Related Battery 04-15-83 05-03-83 11-03-83 F0o 51631 Changes 07-29-83 requested 51629 08-29-83 date past 09-23-83 due i
i
Page 5 ATTACl#ENT STATUS OF LICENSING ITEMS REQUIRING R C APPROVAL NOVEMER 4, 1983 FR(POSED ACRK.
REIESIED ACRML APCo AFCo NtC WC 39ETTAL SWETTA. N9R0tAL #FROVAL TAC ITEM MTE DATE MTE DATE
- 10. IONKS
- 20. Rod Sep Test During Low 03-01-83 03-01-83 N/A N/A N/A Requires no Powr Physics Testing tRC action
- 21. Rod Drop Timing During Low 07-01-84 N/A N/A N/A Requires no Power Physics Testing tRC action
- 22. Aito Rod Control Above 90%
N/A 01-11-83 04-01-83 03-24-83 N/A CCWLETE Power for Unit 2, Cycle 2 09-14-82 12-01-82 and thit 1, C)cle 5 23, Unit 2 Licensing Deletion 01-12-83 01-07-83 N/A N/A N/A Requires no Amendient Clarification tRC action Letter
- 24. FSAR Update 07-01-83 07-01-83 N/A N/A N/A Requires no tRC Action
- 25. Adninistrative Changes
- a. Accutulator and ECCS 02-01-83 02-01-83 09-01-83 10-14-83 N/A 00WLETE Subsysten for FNP 1 and 2 (T.S. 4.5.1.1 (c) and 4.5.2(a))
- b. Generic letter 82-17 on N/A 10-25-82 09-01-83 APCo 49068 Audit of Emenymcy Plan rmWe3 49069 for FNP 1 and 2 (T.S.
date past 6.5.2.8.e) due
(T.S. Table 3.7-4Aand date past 3.7-48) due l
Page 6 ATTA00ENT STATUS OF LICENSING ITEMS REQUIRING f5tC APPROVAL N0WEleER 4, 1983 PRWOSED ACRML REIJESTED ACRR.
Apca MCo mc mC SDETTM. SMGTTAL APPROWAL APPROWAL TAC ITEM DATE DATE DATE DATE 10.
RENUtKS
- d. Adninistrative Change 03-01-83 02-01-83 09-01-83 10-14-83 N/A COWLETE for FNP 1 and 2:
08-23-83
- 1) Fim Detector Table 3.3-12
- 2) RfR Isolation 4.5.2.d.1
- 3) River Water Sury 3/4.7.5
- 4) Yarti fire Hydrant Table 3.7-7
- 5) Service Water Battery 4.8.2.5.2(d)
- 6) Organization Chart Figure 6.2-2
- e. Unit 2 Pressurizer 03-01-83 02-01-83 09-01-83 10-14-83 N/A C0WLETE Sensor Table (T.S.
3.3.3.7)
- f. Unit 1 Refueling Outa y 03-01-83 02-01-83 09-01-83 10-14-83 N/A COWLETE Change: Containnent Vent
- g. Turbine Building N/A 12-10-82 09-01-83 AP00 49287 Hydraulic Snubbers for rm w ai FNP 2 date past die i
h.
Incorporation of N/A 11-24-82 Licensing Requirments for FNP 2 l
l
- 1) FNP 2 License 12-01-83 49182 tbte 2 Condition 2.C.(17)-Containment Vent Line
- 2. The mquested dae date changed to allow for an siditional APCo sutraittal.
Page 7 ATTACl#ENT STATUS W LICEllSIIE ITDES REQUIRING
+
NRC APPROVAL N0VD BER 4, 1983 PMPOSED ACML IESE5TED ACML AFCo AFCo NtC IRC SLNtITTAL SBtITTAL APPRDWE. APPRomL 1AC ITDI MIE MIE MIE MIE 10.
REM M S
- 2) Medianical Srubber 09-01-83 APCo 49182 List for FNe 2 riquested (T.S. Table 3.7-4b) date past de
- 3) FW 2 License 09-01-83 AFCo 49182 Condition requested 2.C.(19)(b) -
date past Contairment due Omrcurmnt Protection
- 1. Organization Change to N/A 11-16-82 09-01-83 10-14-83 N/A COMPLETE Offsite Management for 06-29-83 F W 1 and 2 I
I l
l l
l l
l
Page 1 ATTA09ENT SUPPLEENT LICENSING ITEf6 REQUESTED SUBSEQUENT TO APCo's JAltlARY 13, 1983 LETTER NOVEMER 4, 1983 PR(POSED EllW.
REQESTED ERIAL Apco Apco leC mc SDETTA SBETTA. APPROWE NTROWE TAC ITEM DATE DATE DATE DATE
- 10. REMWKS
- 1. Mninistrative Changes N/A 02-01-83 09-01-83 10-14-83 N/A COWLETE
- a. Engineemd Safety Actuation Systen Instrunentation ACTION Statement 20 Error
- b. Security Plan Audit Frequency
- c. Envirumental Qualification (FNP 1)
- d. Aug'ented low Power Test Progran (FNP 2)
- 2. Turbine Valve Surveillance N/A 05-27-8 07-29-8 07-25-83 N/A 00WLETE (he-Time Change (T.S.
06-20-83 08-01-83 3/4.3.4) for FW 2 07-13-8 07-18-83 07-15-83
- 3. Sntbber Visual Inspection 06-17-83 06-17-83 10-01-83 10-31-83 N/A COWLETE One-Time Change (T.S.
06-20-83 3/4.7.9) 07-08-83
- 4. Enviremental Qualification N/A 05-2(M3 10-21-83 10-21-83 N/A COWLETE Extension Request 08-24-83 09-27-83
- 5. Multiplant Action Iten B-32 N/A 04-06-83 09-01-83 AP00 N/A COWLETE NPsested date past due
- 6. River Water Systen Che-Time N/A 06-20-83 08-03-83 N/A COWLETE Technical Specification 06-20-83 Change 06-29-83
Page 2 ATTA09ENT SUPPLEENT LICENSING ITEMS REQUESTED SUBSEQUENT TO APCo's JAltlARY 13,1983 LETTER NOVEMER 4, 1983 ROOSED ERIAL REQESTED ACTUAL wca M0o seC mc SBETTA. SIMITTA APPROVAL MTROVAL TAC ITEM MTE MTE MTE MTE 10.
RENWKS
- 7. RCS Pmssum Isolation Valve N/A 06-20-83 08-15-83 09-08-83 N/A COWLETE One-Time Technical 07-08-83 Specification Change for FW 2
- 8. Mraulic Sntbber List for 60 days 07-01-84 FW 2 after startup following the Unit 2 2hd R.0
- 9. Unit 2 Inservice Inspection N/A 08-04-83 09-01-83 08-24-83 N/A COWLETE Pmgram Relief Request on first 40-nonth Reactor Vessel Examination
- 10. Relief Request Appeal, Unit N/A 03-12-80 01-01-84 09-16-8 52015 Unit 2 1 and thit 2 Inservice 04-21-80 (Unit 1)
For Unit 52016 Cmplete Testing (IS'; Pmgram 07-16-81 2
Unit 1 Open 03-17-82 08-06-82 10-25-82 06-20-83 07-05-83 10-26-83
- 11. Auto Shmt Trip of RTB, N/A 06-30-83 09-16-83 09-20-83 N/A COWLETE DS-416 08-12-83 08-25-83 09-13-83
- 12. Fim Pmtection Systen N/A 08-26-83 09-01-83 AP00 Mninistrative T.S. Chang rupected date past due See Itan 10 13, Inservice Testing of N/A 09-27-83 01-01-84 of Attachnent Pmssum Isolation Valves 10-11-83 (Unit 1) and Item 10 06-01-84 of Supplenent (Unit 2)
ATTAODENT SUPPLEENT LICENSING ITEMS REQUESTED SUBSEQUENT TO APCo's JAltlARY 13,1983 LETTER NOVDBER 4, 1983 FRWOSED AC ML REGESB ACRIAL AFra MCo nC nC SIDETTAL SLBETTM. MFROWAL APPROWAL TAC MM MIE MTE MTE MTE 10.
RDRES
- 14. Contaiment SuTp Narrw N/A 10-11-83 10-14-83 10-14-83 N/A COPLETE Range Level Ole-Tine T.S.
Change, Unit 1
- 15. mvable Incore Detector N/A 10-21-83 10-21-83 10-21-83 N/A COPLETE Ole-Tine T.S. Change, Unit 1 11-01-83 l
l l
l
?
-