Monthly Operating Rept for Mar 1984
ML20084E275
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/31/1984
From: Salisbury J, Thomason P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CNS840123, NUDOCS 8405020214
Download: ML20084E275 (5)


Text

.

OPERATING DATA REPORT DOCKET NO.

050-0298 U

DATE 4-4-84 COMPLETED BY J.K. Salisbury TELEP110NE 402-825-3811 OPERATING STATUS Notes

1. Unit Name:

C* por Nuclear Sention

2. Reporting Period:

Ftarch, 1984 2381

3. Licensed Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):

778

5. Design Electrical Rating (Net MWe):

787

6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Level To which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

i This Month Yr. to Date Cumulative 744.0 2,184.0 85,489.0 II. Hours in Reporting Period

12. Number Of flours Reactor Was Critical 744.0 2,158.0 69,161.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On Line 744.0 2,140.6 68.058.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.530,624.0 4.369.128.0 134,882,286.0
17. Gross Electrical Energy Generated (MWH1 512,7.,48,:0,

1,475,871.0 42,882,226.0

18. Net Electrical Energy Generated (MWH) 491,524.0 I.413,205.0 41,329,864.0
19. Unit Sersice Factor 100.0 98.0 79.6
20. Unit Availability Factor 100.0 98.0 79.6
21. Unit Capacity Factor (Using MDC Net) 86.5 84.7 63.3
22. Unit Capacity Factor (Using DER Net) 84.9 83.2 62.1

.23. Unit Forced Outage Rate 0.0 2.0 3.7

' 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date, and Duration of Each t:

ofalntennnce. April 7, 1984, 9 days.

1

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior ta Commercial Operationl:

Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 8405020214 540331 PDR ADOCK 05000299 R

PDR go,7 7,

AVERAGE DAILY UNIT POWER LEVEL i

DOCKET No.

050-298 CNS LWIT DATE l

4-4-84 COMPLETED BY J. K. Salisbury TELEPHONE 402-825-3811 i

MONTil March, 1984 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l

lMWe Net)

(MWe Net) 707 623 g7 713 533 gg 627 702 3

39 4

518 20 734 3

659 21 698 701 6

697 706 696 7

23 704 0I9 8

24 695 516 9

25 10 617 665 26 503 690 27 3;

664

g 687 13 706 29 692 g4 700 09I 30 gg 701 624 3;

16 699 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting inonth. Compute to 4;

the nearest whole megawatt.

i 19/77)

I-050-298 DOCKET NO.

UNITS!!U1 DOWNS ANDPOWER REDUCTIONS CNS UNIT N WE

~

DATE 4-4-84 COMPLETED BY J-K.

bli=" ry REPORT 510NT!! h rch TELEPilONE 402 R?;-laii i

w.

E c

j3 3

y E~

Licensee

[g h

Cause & Currective 3

Action to Date g

3g 4-2iE Event

?

gO g

Present Recurrence y~

5

~ g =!

Report :

mO H

eu e

6 (N('NE D: RING REPORTUG PERIC3)

.1 E

E 2

1 3

4 F: Furced Reason:

Elethod:

Exhibit G-Instructions S: Schedu!ed A-Equipment Failure (Explain) 14fanual for, Preparation of Data B4taintenance of Test 24tanual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) Fde INllREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examinatism F-Administrative 5

G-Operational Erro:(Explain)

Exhibit I Same Source r7/77)

IIOther(Explain)

. o me Operations Narrative Cooper Nuclear Station March, 1984 The plant operated the month of March with no scheduled or unscheduled shutdowns or power changes.

A capacity factor of 84.9 was achieved for the month of March.

7, * ' *.

s CooPI' H NUCLE A f4 $ T A i ton Nebraska Public Power fistrict

""1""* ih"" T/I!MZe^Y^ ""'

CNSS840123 April 5, 1984 Director, Office of Management Information and Program Control U.S. Nucicar Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operation Status Report for March 1984 Docket No. 50-298 Gentlement Enclosed for your information and use in the Cooper Nuclear Station Monthly Operating Status Report for March 1984. The report includes Operating Status, Average Daily Unit Power f.evel Unit Shutdown data, and a Narrative Summary of Operating Experience.

Should you have any commentn or require additional information regarding this report, please contact me.

Sincerely, this e/ At w P. V. Thomason Division Manager of Nuclear Operations PVTilh Enclosure cc:

G. D. Watson w/cnc.

A. C. Gehr w/ enc.

J. T. Collins w/ene.

+I h'