Ro:On 710105,standby Gas Treatment Sys Discharge Damper Motor Failed.Caused by Loose End Bell.Motor Repaired
ML20084D606
Person / Time
Site: Dresden Constellation icon.png
Issue date: 01/12/1971
From: Hoyt H
COMMONWEALTH EDISON CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084D608 List:
References
10261, NUDOCS 8304120120
Download: ML20084D606 (1)


Text

4 -.

4 0

50-a37 Commomvealth L.ison Company ONE FIRST NATIONAL PLAZA 4 CHICAGO. B L LI N OI S Address R. ply to:

POST OrflCE toX 767

  • C H I C A G O, ILLIkols 40490 Dresden & cle ar Power Station 0

R. R. #1 Morris, I: lit ois 60450

e'

'i January 1:, : 971 n'h s

l'..f:..

Q pg

.~

Dr. Peter A. Morris

^

Division of Reactor Licensing E:-

U.S. Atomic Energy Commission s

Washington, D.C. 20545 U

SUBJECT:

LICENSE DiR-19. DRESDEU NUCLEAR 0..:'R STATION, UNIT #2 SECTION 6.6.C.1 of TECHNICAL SPiU1 CATIONS

Dear Dr. Morris:

This is to report a condition relati'g,o the operation of the station in which during a surveillance test, t'e

'A" standby gas treatment system discharge da:r.per motor failed.

PROBLEM AND INITIAL ACTION At 3:00 FM on January 5, 1971, a sur ei. lance test of the Standby Gas Treatr.ent System was conducted.

I it al configuration was with "A" train in " Primary" and "B" train in ".taidby".

To start the test, the ventilation radiation monitors were

~B" train remained in " standby".

_)

At this time it was noticed that "A" train had no discharge damper position 1

indication.

Investigation of the damper motor brsaker indicated that it was tripped and could not be reset.

INVESTIGATION Investigation of the cause of tt e breaker trip revealed that the

/

fendbellofthemotorwasloose.

The motcr'had apparently failed, tripping l the breakar.

The damper was found in the "open" position.

g CORRECTIVE ACTION The motor is being repaired, T: e discharge damper was :nnually closed and secured to prevent backflow.

Laily testing of B" SGT system train will be performed until "A" train is again operable.

The repaired motor was installed, checked out and returned to service on January 8, 1971. Daily testing of "B" SBGT system was then terminateds

/s/o y jr

>> */1/

,e Go Sincero 10261 B$0$1201207i0112 PDRADOCK05000g

{

S.,

H.K.Hoyt AN 101971

.202.

COPY SEN hEGION

/

HKHarh

(

a