Forwards Rev 2 to Songs,Unit 2 Response to GL 92-01 & Rev 2 to Songs,Unit 3 Response to GL 92-01 Re Reactor Vessel Structural Integrity
ML20084C406
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/23/1995
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20084C411 List:
References
GL-92-01, GL-92-1, NUDOCS 9505310506
Download: ML20084C406 (2)


Text

.ra Southem Califomia Edison Company 23 PARKER STREET IRVINE, CALIFOHNIA 92718 May 23, 1995 WAL'fE.9 C. MARSH m.

,m~.

MANAGFR OF NUCLE AR NEGUIMORY AFF A6RS (714) 4&4-4403 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Response to Generic Letter 92-01, Revision 1. " Reactor Vessel Structural Integrity,10 CFR 50.54(f)"

San Onofre Nuclear Generating Station Units 2 and 3

References:

1.

Letter from W. C. Marsh (SCE) to U. S. Nuclear Regulatory Commission Document Control Desk, dated April 17, 1995;

Subject:

" Request for Withholding Information from Public Disclosure, Response to Generic Letter 92-01" 2.

Letter from W. C. Marsh (SCE) to U. S. Nuclear Regulatcry Commission Document Control Desk, dated April 28, 1995;

Subject:

" Amendment of Request for Withholding Information from Public Disclosure, Response to Generic Letter 92-01" 3.

Letter from W. C. Marsh (SCE) to V. S. Nuclear Regulatory Commission Document Control Desk, dated June 22, 1994; l

Subject:

" Revision to Supplemental Response to Generic Letter 92 01, Revision 1, ' Reactor Vessel Structural Integrity,10 CFR 50.54(f)'"

4.

Letter from William T. Russell (NRC) to Harold B. Ray (SCE) dated March 20, 1995;

Subject:

" Request for Withholding Information from Public Disclosure, - San Onofre Nuclear Generating Station Units 2 and 3 - Response to Generic Letter 92-01" In response to NRC notification that 10 CFR 2.790c protection would not be granted to Edison's responses to Generic Letter 92-01, Revision 1, " Reactor Vessel Structural Integrity,10 CFR 50.54(f)" (GL 92-01), Edison withdrew the proprietary portions of its responses by References 1 and 2.

This submittal is a full replacement for all previous GL 92-01 responses.

j With the support and cooperation of Asea Brown Boveri - Combustion Engineering, the prop)rietary information contained in our most recent GL 92-01 1

response (Reference 3 has been released to meet the NRC's need for public disclosure of this information (Reference 4).

To facilitate NRC review of 9505310506 950523 PDR ADOCK 05000361 p

PDR 0 '\\

a f ""

Document Control Desk this submittal, Attachments A and B have identical technical content as Attachments A and B of our June 22, 1994 GL 92-01 submittal (Reference 3).

If you have questions or require further information, please let me know.

Sincerely,

$h0Ihh Attachments cc:

L. J. Callan, Regional Administrator, NRC Region IV A. B. Beach, Director, Division of Reactor Projects, Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Of fice, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 H. B. Fields, NRC Project Manager, San Onofre Units 2 and 3

,