Interim Deficiency Rept DER 84-18 Re Wiring Error on Low Pressure Safety Injection Pump B CS-3 Switch.Initially Reported on 840326.Bechtel Will Determine Reportability of Subj Item.Final Rept Expected by 840612
ML20084C113
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/18/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29315-BSK, DER-84-18, NUDOCS 8404270098
Download: ML20084C113 (3)


Text

j+

Arizona Public Service Company April 18,1984 ANPP-29315 -BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:- Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs Subjec t:

Interim Report - DER 84-18 A 50.55(e) Potentially Reportable Deficiency Relating to Wiring Error on LPSI 'B' Pump CS-3 Switch.

File: 84-019-026; D.4.33.2 Telephone Conversation between P. Narbut and T. Bradish on

Reference:

March 26,1984.

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the

. referenced telephone conversation. At that time, it was estimated that a Jetermination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by June 12, 1984, at which time a complete report will be submitted.

Very truly your x

r-m

'}e

.u M

ALW )%

f)f Of E. E. Van Brunt, Jr.

APS Vice President, Nuclear f

ANPP Project Director EEVB/TRB:db Attachment ec: See Page Two ohg OC PDR

-a_

/fHol1

s Mr. T. W. Bishop DER 84-18 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U.' S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza

.D. E. Fowler J. Vorees J. R. Bynum P. P. Klute A. C. Gehr -

W. J. Stubblefield W. G. Bingham R. L. da tterson

' l R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 a

9b

< 4 INTERIM REPORT - DER 84-18 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNCS UNIT 1 I.

Potential Problem DCP ISE-RNF083 requires the installation of control switch CS-3 in 4.16 kV switchgear IE-PBB-S04F and wiring revisions to be made in accordance with BR3 of vendor drawing E009-186-9.

The DCP was signed as completed on March 10, 1983 but the wiring modifications were not completed until implementation of the work to NCR SE-3551 (SFR/NCR approval date 1/12/84) which resulted from a separate walkdown verification of vendor wiring. The effect of the wiring error, if left uncorrected, would cause LPSI B pump misoperation with the CS-3 switch in the local position.

II.- Approach to and Status of Proposed Resolution Bech'tel Engineering is currently working with APS Startup to determine reportability and justification for corrective action.

III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the-Final Rsport is Forecast to be completed by June 12, 1984.