ML20084B239

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 3.3.3.5 & 3.3.3.6 Re Required Operable Channels of Core Exit Thermocouples
ML20084B239
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/25/1995
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20084B229 List:
References
NUDOCS 9505310176
Download: ML20084B239 (2)


Text

r 3

ST-HL-AE-5086 ATTACIIMENT 3 TECHNICAL SPECIFICATION PAGE 3/4 3-72 FOR ACTION 42 c.

9505310176 950525 DR ADOCK 05000498 PDR TSC-95\\95 t38 001

3

}

ST-HL-AE-5086 TABLE 3.3-10 (Continued)

ACTION STATEMENTS (Continued) c.

With the number of OPERABLE channe s than 4 thermo-couples per quadrant, re ese thermocouples to

-OPERABLE s in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in at least HOT j

N within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

ACTION 43 -

a.

With the number of OPER/,BLE channels two less than the Total Number of Channels requirements, restore the inoperable channel to OPERABLE status within 31 days, or be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

l b.

With the number of OPERABLE channels three less than the Total Number of Channels requirement, restore at least one r

inoperable channel to OPERABLE status within 7 days, or be l

in at least HOT SHUTOOWN within the next'12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

c.

With the number of OPERABLE channels less than the Minimum Channels Operable requirement, restore at lea.st one inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTOOWN within the next 'u hours.

f 6

e i

6 TSC-95\\95118 001 I

SOUTH TEXAS - UNITS 1 & 2 3/4 3-72 AMENDMENT NOS. 14 AND 4

-