N mu" mestem union
... Telegram j
i LD 018 TDVE CORDOVA, ILLINOIS JULY 16 1972 12:' LOP t
MR EDWARD JORDEN REGION 3 COMPLlANCE U S ATOMIC ENERGY COMM 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS RE: SQUAD-CITY NUCLEAR POWER STATION UNIT 2-DRP-30 APPENDIX A SECTIONS 6.6. A.3 AND 6.6.B.3 AT 3AM ON 7/'i6/72 A SMALL FIRE WAS DISCOVERED IN TWO ELECTRICAL CABLE TRAYS.
1HE REACTOR WAS OPERATI NG AT 80 PERCENT POWER AND A CONTROL SHUT DOWN WAS ORDERED THE GENERATOR WAS OFF SYSTEM AT 5:37AM 7/16/72. THE REACTOR PROTECTION SYSTEM REMAINED OPERABLE AND BOTH PRIMARY AND SECONDARY CONTAIN-MENT SYSTEM WERE MAINTAINEXD. THE ONLY DEGRAGATION OF SAFETY RE-LATIVED SYSTEM WAS THE INABILITY TO CLOSE THE SUCTION AND plSCHARGE
)
WU 1201 (R 549; VALVES FOR THE TWO B REACTOR CIRCULATION PUMP BECAUSE OF THE FIRE DAMAGE CONTROL WIRING.
THE FIRE WAS EXTINGUISED USING PORTABLE CARBON DIOXIDE EXTINGUISOR.
INVESTIGATION OF CAUSE IS IN PROGRESS.