ML20084A852
| ML20084A852 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 04/16/1984 |
| From: | Adensam E Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20084A853 | List: |
| References | |
| NUDOCS 8404250300 | |
| Download: ML20084A852 (6) | |
Text
.. _ - -
/
o UNITED STATES i
1 NUCLEAR REGULATORY COMMISSION 1
s a
waswmorou. o. c. rosss a'
%*****/
SOUTH CAROLINA ELECTRIC & GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET NO. 50-395 l
VIRGIL C. SUPNER NUCLEAR STATION, UNIT NO.1 i
AMENDMENT TO FACILITY OPERATING LICENSE J
Amendment No. 22 License No. NPF-12
]
1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment to the Virgil C. Sumer Nuclear Station, Unit No. 1 (the facility) Facility Operating License No. NPF-12 filed by the South Carolina Electric & Gas Company acting for itself and South Carolina Public Service Authority (the licensees), dated July 22, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the applicatit9, as amended, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety-of the public, and (ii) that such activities will be conducted in compliance.
with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this license amendment will not be' inimical to the common 1-defense and security or to the health and safety of the public;-
E.
The issuance of this license amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have.
been satisfied.
I 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment and
- i paragraph 2.C(2) of Facility Operating License No. NPF-12.is hereby amended to read as follows:
-l (2) Technical Specifications
)
The Technical Specifications contained in ' Appendix A, as revised through Amendment-No. 22, are hereby-incorporated into this license.
South Carolina Electric & Gas Company shall operate the facility'in j
accordance with the Technical Specifications and the Environmental-Protection. Plan.
..p I
8404250300 840416 l
PDR ADOCK 05000395 i
_1
)
j p
- ~-
_____a
-w e,e._
l 2
j 3.
This license amendment is effective as of its date of issuance.
3 FOR THE NUCLEAR REGULATORY COMMISSION Elinor G. Adensam, Chief 1l Licensing Branch No. 4 Division of Licensing
Enclosure:
4 Technical Specification Changes Date of Issuance: April 16, 1984 t
b b
,j-
.f u!.
~
1 1
~
I
__m~
-j ATTACHMENT TO LICENSE AMENDMENT NO. 22 j
FACILITY OPERATING LICENSE NO. NPF-12 i
DOCKET NO. 50-395 i
7 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
Amended Page 3/4 6-10a 3/4 6-10b
'i 3/4 6-10c se p.j
- j
~
h 1
i*
f:1> j_
. a -..
9 n
Table 4.6-la.
Base value.of tendon force' 2
SURVEILLANCE TENDONS i
"i INSPECTION PERIOD t
1 2
3 Base value Base value Base value j
Tendon (kips)
Tendon (kips)
Tendon (kips) 0-104 1275 D-125 1230 0-108 1287 ll D-129 1245 0-213 1228 D-121 1225 i
0-219 1265 D-228 1275 D-213 1223 r
D-328 1287 D-324 1273 0-316 1284 V-23 1328 V-23 1319 V-23 1313 V-46 1309 V-30 1287 V-37 1299 V-67 1332 V-53 1316 V-60 1294 V-92 1299 V-76 1315 V-83 1314 V-115 1322 V-99 1309 V-106 1296 3AC 1318 3AC-1309 3AC 1303 88A 1266 138A 1278 8CB 1249 13C8 1283 18CB 1259 188A 1249 28CB 1260 28BA 1259 28AC 1259 38AC 1250 33CB 1278 33BA 1272 388A 1250 41AC 1268 38CB-1226
'o
[%-
c:
ls
'N
?..'
ij p
Ai
-a l4 4
5 h
3/4;6-10a Amendment No. - 22
- ]
- ;
[d
i
~ !.
Table 4.6-lb.
Base value of tendon force ADJACENT TENDONS INSPECTI0li PERIOD
'i 1
2 3
Base value Base value Base value i
Tendon (kips)
Tendon (kips)
Tendon (kips) 0-103 1245 D-124 1284 D-107 1241 4
D-105 1250 0-126 1262 0-109 1222
.j D-128 1296 D-212 1300 D-120 1284 0-130 1267 D-214 1252 D-122 1264 D-218 1296 0-227 1270 0-212 1294 0-220 1299 D-229 1235 0-214 1248 D-327 1244 0-323 1256 D-315 1266 0-329 1237 D-325 1227 D-317 1233 V.22 1306 V-22 1300 V-22 1295 V-24 1320 V-24 1317 V-24 1313 V-45 1308 V-29 1301 V-36 1284 V-47 1322 V-31 1327 V-38 1293 V-66 1309 V-52 1316 V-59 1308 V-68 1309 V-54 1298 V-61 1309 V-91 1309 V-75 1304 V-82 1297 V-93 1327 V-77 1313 V-84 1311 V-114 1313 V-98 1280 V-105 1297 V-1 1320 V-100 1300 V-107 1307 2AC 1272 2AC 1265 2AC 1260 4AC 1255 4AC 1248 4AC 1242 7BA 1318 12BA 1262 7CB 1298 9BA 1286 14BA 1259 9CB 1275 12CB 1279 17CB 1268 17BA 1256 14CB 1266 19CB 1282 19BA 1284 27CB 1273 27BA 1285 27AC 1291 29CB 1276 29BA 1268 29AC 1250 37AC 1278 32CB 1256 32BA 1253 1
39AC 1290 34CB 1229 34BA 1249 i
37BA
=1289 40AC 1272 37CB 1272-39BA 1266 42AC 1251 39CB 1286
~
1
.4 h
~
j-c 3/4 6-10b Amendment No.22 1
~i i
Table 4.6-2.
Normalizing factors (N.F.)
- l' 4
j INSPECTION PERIOD t]
1 2
3
't N.F.
N. F.
N. F.
Tendon (kips)
Tendon (kips)
Tendon (kips)
~
0-104
-24 D-125 36 D-108
-42 D-129 33 0-213 46 D-121 40 D-219 10 0-228
-28 D-213 46 D-328
-21 D-324
-12 0-316
-31 1
V-23
-15 V-23
-15 V-23
-15
~!
V-46 11 V-30 31 V-37
-5 V-67
-21 V-53
-24 V-60 11 V-92 25 V-76
-11 V-83
-15 V-115
-10 V-99 5
V-106 7
3AC
-56 3AC
-56 3AC
-56 8BA 18 13BA
-26 8CB 26 13CB
-23 18CB 29 18BA 34 28CB 26 28BA 17 28AC 10 38AC 40 33CB
-17 33BA
-16 38BA 40 41AC 0
38CB 54 l
i
.f
. }
6
'l
-f
'i 1
.4
$i:
.~i lL l
SUMMER - UNIT 1 3/4 6-10c Amendment No.' 22 1
.