ML20083R693
| ML20083R693 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/11/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8404240256 | |
| Download: ML20083R693 (1) | |
Text
_
DUKE POWER GOMPANY P.O.150X 331tM)
CitAHLOTTE. N.C. 215242 IIAL II. TUCKEH retepuoxa
- ~"
. mil.."/Co-April 11, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re:
Catawba Nuclear Station, Unit 1 Docket No. 50-413 Proof and Review Technical Specifications
Dear Mr. Denton:
In the Catawba SER on page 7-22 it is stated "until an acceptable circuit modification is installed, the staff will require Technical Specifications to include monthly tests (instead of quarterly) of any slave relay that has a proving lamp."
Please be advised that the required circuit modification will be installed prior to fuel load. Therefore, no change to the Technical Specifications will be required.
Very truly yours, h-
/$
Hal B. Tucker RWO/php cc: Mr. James P. O'Reilly Palmetto Alliance Regional Administrator 21351 Devine Street U. S. Nuclear Regulatory Commission Columbia, South Carolina'29205 Region II 101 Marietta Street, NW, Suite 2900 Mr. Jesse L. Riley Atlanta, Georgia 30303 Carolina Environmental Study Group 854 Henley Place NRC Resident Inspector Charlotte, North Carolina 28207 Catawba Nuclear Station Mr. Robert Guild, Esq..
Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29205
$ lT$'
O!Mj3 8