Text
g
,.~
6 0-
[.N Commonwealth Edloon
) one First National Ptrza, Chicigo, Illinois.
O-e\\C Address Reply to: Post Offica Box 767 Chicago, lltinois 60690 February 17, 1983 i
Mr. Harold R. Denton, Director-Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Ccmmission.
Washington, DC. 20555-
Subject:
Quad Cities Station Units 1 and 2 Inservice Inspection and Testing Program, Second 10 year Program NRC Docket-Nos. 50-254-and 50-265-References (a):
R. F. Janecek letter to Director of
~
NRR dated September 30, 1980.
(b):
T. J. Rausch letter to D. B. Vassallo dated June 15, 1982.
Dear Mr.'Denton:
-In accordance with 10 CFR 50.55a, attached is the Quad Cities Station Units 1 and 2, Second 10 Year Inservice Inspection
As explained on page-1-1 of the Attachment, this program is applicable for the one-hundred twenty (120) month interval.beginning February 18, 1983 and March 10, 1983 for Units 1 and 2, respectively.
-The second 10 year ISI/IST program has been written in
-accordance with Section XI of the ASME Boiler and Pressure Vessel
-Code, 1980 Edition, including the winter 1980 addenda.
The major differences in the program are as follows:
1)
The reference to each specific system line number and the total number of welds on each line has been deleted.
Each type of weld is listed giving its Class and how it is to be examined.
2)
The ISI Program includes a new-section with a table listing the component supports and the type of examination required.
3). Section 3: of this program addresses the Snubber Program.
Included in this section is a list of all snubbers referencing the ISI Support Number, the Technical Specification number, type, system and test parameters.
4)
The IST Program has been only slightly altered.
The new Cooe requires'the pump parameters to be recorded on a quarterly basis instead of the previous monthly requirement.
Therfore, the Station is dropping its relief request for this item.
0
4o-H.' R. Denton: -
February 17, 1983 15)- TheLudsted-IST Valve Program'now explains the justificationJfor-
? testing certainJvalves which can only be manipulated in Cold
- Shutdown.
Relief. requests concerning this subject.have been 0
subsequently dropped.
.t 16): Relief requests-have been dropped-.for_-the_ minimum flow valves on the Core Spray, RHR, and HPCI systems.
.These valves will now be' stroke timed quarterly'during normal operation.
r In Reference.(b), Commonwsalth Edison responded to; numerous.
..NRC requests for1information concerning'our'recent 40 month ISI/IST
. program which was developed in accordance with.the-1974 Edition
~
._(including the Summer 1975 Addenda) of the,ASME Boiler and Pressure.
Vessel Code.
In this response we. indicated that the ISI/IST program U
woul'd be revised-in some' areas to reflect our. response.- We have~
-made these revisio'ns in both the Summer 1975. Addenda program and in
'the:new'second 10~ year program which includes'the Winter 1980 i
Addenda.-
Because the second 10. year program is now the program of interest, we are.not providing.the NRC;with a copy of our revised 1975. program.
This now moot revision can be: supplied-at your request..
1 If you have any questions.concerning this matter, please
~ direct them to'this; office.
_ 0ne (1) signed original and forty L(40) copies of this transmittal letter are provided for your use, along with four.(4)
- copies of the.second 10 year program.
Very truly yours, ThomasJ.gauschAw Ck
/
Nuclear Licensing Administrator 1m-
-Attachment cc:~
R. Bevan - w/att.
- Region III~ Inspector - w/o_att.
~6020N