.o i
Arizona Public Service Company April 10, 1984 ANPP-29269-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Interim Report - DER 84-12 A 30.55(e) Potentially Reportable Deficiency Relating to Zone III Violations of RCP 1A and S/G #1 File: 84-019-026; D.4.33.2 Re ference: Telephone Conversation between P. Narbut and T. Bradish on March 14, 1984
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be i
finalized by June 1,1984, at which time a complete report will be i
submitted.
{
Very truly rs
. \\ Ch.
%UL-E. E. Van Brunt, Jr.
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db 1
Attachment S;fg.j cc:
See Page Two
" Z lid 9 I l'd/ y y N Y o! M $
N53ta
/e=- G
_,.l
-Mr. T. W. Bishop ANPP-29269 Page Two cc:
Richard DeYoung, Director Office of Inspection and' Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza J. Vorees J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen C. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Pcwer Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339 E
]
g g'r -
INTERIM REPORT - DER 84-12 POTENTIAL REPORTABLE DEFICIENCY l
ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT 1 3
I.
Potential Problem
'A. The Zone III in RCP 1A, Unit I was violated when a barrier was i
removed inside the discharge line exposing the pump to grinding residue and lack of material accountability.
1
)
B. The Zone III and cleanliness level in Steam Generator #1, Unit 1 was violated due to removal of the manway cover without zone coordination and control, allowing grinding residue to enter the Steam Generator.
i II.
Approach-to and Status of Proposed Resolution -
i
?
Bechtel Engineering is currently corresponding with C-E to determine reportability.
III. Projected Completion of Corrective Action and Submittal of 'the Final Report Evaluation of this condition and. submittal of the Final Report is Forecast to be completed by June 1,1984.