ML20083Q014
| ML20083Q014 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/12/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-29284-BSK, DER-83-75, NUDOCS 8404200298 | |
| Download: ML20083Q014 (2) | |
Text
~
Arizona Public Service Company April 12,1984 ANPP-29284-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-75 A 50.55(e) Potentially Reportable Deficiency Relating to Bolts Securing the Two D0126SA Panel Filler Assemblies, Supplied by Foxboro, were Improperly Torqued.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between R. Dodds and R. Tucker on November 2, 1983 (B) ANPP-28361, dated December 5, 1984 (Interim Report)
(C) ANPP-28663, dated January 23, 1984 (Time Extension)
(D) ANPP-28918, dated February 22, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by Reference (C) and (D). At that time, it was estimated that a Final Report would be available by April 19, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by May 25, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours
(
9S cut an
,,4 't 3 E. E. Van Brunt, Jr.
APS Vice President, Nuclear ANPP Project Director r
EEVB/TRB:db dI d '3 - l o..
cc:
See Page Two kJ.,*. E PfjAG3.J 0404200290 840412 1
~ 7 Q.,
PDR ADOCK 05000528
/
6(
8 PDR lU
e i
su Mr. T. W. Bishop DER 83-75 Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza J. Vorees J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen O. A. Flore111 S.'R.
Frost J. Self
'D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339 a
.-