ML20083P269

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Insp of Approx 240 Small Bore (2 Inches & Under) Piping Bends.Initially Reported on 821013. Insp Complete.Final Response Will Be Submitted by 830222. Results Undergoing Engineering Evaluation
ML20083P269
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/26/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, L-83-39, NUDOCS 8302030427
Download: ML20083P269 (1)


Text

1 P. O. BOX 14000, JUNO BE ACH, F L 33408 FLORIDA POWER & LIGHT COMPANY January 26, 1983 L-83-39 g

5E Mr. James P. O'Reilly M

Regional Administrator, Region II U

S. Nuclear Regulatory Commission E_

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

{

~

Dear Mr. O'Reilly:

Re: St. Lucie Unit 2 Docket No. 50-389, 10 CFR 50.55(e),82-019 Bent Small Bore Piping Not Inspected On October 13, 1982, Florida Power and Light notified the NRC of a potential 10 CFR 50.55(e) condition existing at St. Lucie Unit #2 site involving inspection of approximately 240 small bore (2 inches and under) piping bends.

Florida Power and Light then submitted an interim report requesting a response date of January 28, 1983. The piping inspection is complete but the results are still undergoing engineering evaluation, therefore, Florida Power and Light will not be able to complete the final report by January 28, 1983.

Florida Power and Light will complete the engineering evaluation and submit a final response by February 22, 1983.

Very truly yours,

.a dl }wh GW Robert E. Uhrig Vice President Advanced Systems and Technology REU/RJS/ cab