Responds to NRC Re Violations Noted in Insp Repts 50-361/95-05 & 50-362/95-05 on 950320-24.Corrective Actions: Replaced Clerk Involved & Counselled Access Authorization Staff
ML20083P187
Person / Time
Site: San Onofre  
Issue date: 05/18/1995
From: Rosenblum R
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9505240092
Download: ML20083P187 (2)


Text

..

f

  • w 4.

f[5" Southem Callbmla Edison Cbmpany 23 PARKEN STREET RCHARD M. ROSENBLUM tgLEPMont vics passaosat Fu-a s s.es so U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

Reply'to a Notice of Violation San Onofre Nuclear Generating Station, Units 2 and 3

References:

1) Letter, Mr. Samuel J. Collins (USNRC) to Mr. Harold B. Ray (Edison), dated April 12, 1995
2) Letter, Mr. R. W. Krieger (Edison) to USNRC Document Control Desk, dated March 1, 1995 Reference 1 provided the results of a routine security inspection by Mr. D. Schaefer for the period March 20-24, 1995.

The letter also included a Notice of Violation (361/95-05-02) for granting initial unescorted access into the Protected Area (PA) prior to receipt of'the results of the fitness-for-duty drug and. alcohol tests.

Reference 2 provided the required 30-day written Licensee Event Report (LER) for the above noted occurrences involving incomplete PA access authorization processing.

These occurred during the Unit 2 pre-outage period when approximately 778 authorizations were being processed.

The reason for the violation was inattention to detail by the clerk processing the access authorization documents, and a failure to exercise due diligence in supervisory oversight by the supervisor.

As noted in Reference 2, Edison has replaced the clerk involved and counselled the access authorization staff.

In addition, Edison made a computer modification in the Training Records Information Management System (TRIMS) to minimize the potential for a security badge being issued before satisfactory completion of'the drug screening process.

Edison has also issued a desk guide for security badge issuance.

9505240092 950518 PDR ADOCK 05000361 Q

PDR

}i p

  • se pwar f e,. war Document Control Desk Full compliance was achieved on February 7,1995, when access levels for the last inappropriately issued security badge were deactivated.

If you have any questions, please call Mr. Jack Wallace at (714) 368-9940.

Sincerely, cc:

L. J. Callan, Regional Administrator, NRC Region IV A. B. Beach, Director, Division of Reactor Projects, Region IV K.

E.

Perkins, Jr.,

Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 and 3 M. B.

Fields, NRC Project Manager, San Onofre Units 2 and 3