Text
........ -. -.. -. -. - -..
i
\\.
Sc-30 DAVIS-BESSE REVISION COVliR"3 d 7
January 7, 1983 DATE TO: /
M IM b FROM: EMERGENCY PLANNING & PREPAREDNESS SUPV.
EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual Changes
SUBJECT:
Davis-Besse This letter transmits additions and revisions to the Davis-Besse Control Copy 8 M.
EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual.
Instructions for the material are as follows:
REMOVE AND RETURN INSERT Revisica Index, Rev. 22 Revision Index, Rev. 23
)
T-6938 in front of EI 1300.02 EI 1300.08.4 EI 1300.08.5 6
4 Date Revision Entered Addressee Signature REIURN TO THE OFFICE MANAGER - STOP #3b30 24
$h $$
0$
/)dI.
F je i
. ~..
e_+
-m m.
++-w.w-..e-e.-
..e.
T l
DAVIS-BESSE REVISION COVER SHEET I
January 7, 1983 DATE TO:
O c d 'Y Y b 0, i
FROM: EMERGENCY PLANNING & PREPAREDNESS SUPV.
SUBJECT:
Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual Changes This letter transmits additions and revisions to the Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual. Ccntrol Copy 8 E.
Instructions for the material are as follows:
REMGVE AND RETURN INSERT S
Revision Index, Rev. 22 Revision Index, Rev. 23 I
T-6938 in front of El 1300.02 EI 1300.08.4 EI 1300.08.5 l
Date Revision Entered l
Addressee Signature RETURN TO THE OFFICE MANAGER - STOP #3050
THE TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES
)
REVISION INDEX PAGE REVISION PROCEDURES REVISION TEMPORARY MODIFICATIONS i
0 EI 1300.00 3
EI 1300.01 4
EI 1300.02 3
T-6938 EI 1300.03 3
EI 1300.04 3
EI 1300.05 3
EI 1300.06 -
3 EI 1300.07 2
EI 1300.08 5
EI 1300.09 1
D' EI 1300.10 1
EI 1300.11 1
EI 1300.12 2
T-6820 l
l 1
l l
l l
Revision 23 i
January, 1983 1
Di TRILUTioN original, R:spinsibl1Section H ad Actirn f
File Copy, Master File COPIES TO BE MODIFIED FoR IMMEDI ATE IMPLEMENTATION B
TEMPORARY MODIFICATION REQUEST DAVIS BESSE NUCLEAR POWER STATION - UNIT 1 E.C.C*
2 Shift Supervisor - 2 Control Room - 2 ED 6926 SECTION 1 PROCEDURE TITLE AND NUMBER Unusual Event EI 1300.02 RE ASoN FoR CHANGE For added clarification of an EDO responsibility.
To ensure the prompt notification of Key Emergency Response Personnel and Agencies, if required.
CHANGE Add a note to section 5.2.3 as follows:
5.2.3 NOTE:
If the E.D.O. reports to the E.C.C., he should contact the Emergency Planning Supervisor (E.P.S.) by telephone, or request Control Room i
personnel to contact the E.P.S. via the Emergency Call System individual I
page.
l l
l l
IS PROCEDURE P VISION REQUIRED PREPARED 8Y DATE 12/21/82 g
g APPROVED BY DATE I
APPROVED BY [
DATE D -"t"barAs
-AA
^"
RECoMMifNDED BY (SR8 Chairman)
DATE
/
/
//
R. Ia. B ou', L,
i2/27 /RL QA APMoVED BY (Manager of Quality Assur5 nce)
DATE 4
< f P_ D 8, (st.t,on..a,, h.n.nt, e.Th/ o / A
,n
)g n