Application to Amend Licenses DPR-71 & DPR-62 Revising Tech Specs Re Digital Instrumentation W/Analog Counterparts
ML20083M814
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/26/1983
From: Eury L
CAROLINA POWER & LIGHT CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20083M817 List:
References
NUDOCS 8302010468
Download: ML20083M814 (3)


Text

l CD&L Carolina Power & Light Company JAN 261983 Director of Nuclear Reactor Regulation Attention:

Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing United States Nuclear Regulatory Cornmission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 REQUEST FOR LICENSE AMENDMENTS DIGITAL TO ANALOG INSTRUMENTATION CHANGE

Dear Mr. Vassallo:

SUMMARY

In accordance with the Code of Federal Regulations, Title 10, Part 50.90 and Part 2.101, Carolina Powec & Light Company (CP&L) hereby requests revisions to the Technical Specifications (TS) for the Brunswick Steam Electric Plant, Unit Nos. I and 2.

These revisions, which are administrative in nature, concern the replacement of certain digital instrumentation with analog instrumentation.

DISCUSSION On November 19, 1979, CP&L submitted a request for TS changes to replace certain digital instrumentation with analog counterparts.

In response to the request, the NRC issued a Safety Evaluation Report (SER) supporting Amendment Nos. 26 and 50 (dated March 14, 1980) for Brunswick Unit No. I and Brunswick Unit No. 2, respectively. The SER stated that the proposed plant modifications were technically acceptable and that CP&L would periodically submit administrative TS changes to revire instrument designations for those systems which had the digital-ro-analog modification completed. This submi aal reflects the installation of certain analog instrumention underway I

on Bru swick Unit No. I and the upcomin,( installation of this instrumentation l

on Brenswick Unit No. 2.

I Plant procedures for Brunswick Unit No. I are being revised for the new instrumentation, but surveillance intervals and other requirements will remain in accordance with the existing TS until the requested changes are l

approved and issued by the NRC.

Oh k B302010468 830126 g ($

g\\)

DRADOCK05000g 411 Fayetteville Street

  • P. O. Box 1551 e Raleigh. N. C. 27602

D. B. Vassallo The proposed TS changes enclosed also include the following:

1.

Typographical corrections.

2.

Proposed revisions submitted by our letter dated June 16, 1982 concerning redundant scram discharge volume high level instrumentation (issued for Brunswick Unit No. 2 only by Amendment No. 73 dated August 17, 1982).

3.

Proposed revisions submitted by our letter dated December 13, 1982 concerning the minimum number of operable channels per trip system requirements for certain High Pressure Coolant Injection (HPCI) System and Reactor Core Isolation Cooling (RCIC) System isolation actuation instrumentation.

The enclosed TS changes do not include the following:

1.

Proposed revisions submitted by our letter dated March 16, 1982 concerning HPCI/RCIC time delay relays.

2.

Proposed revisions submitted by our letter dated July 29, 1982 concerning degraded voltage and loss of voltage relays.

3.

Proposed revisions submitted by our letter dated September 7,1982 concerning low condenser vacuum actuation of group 1 primary containment isolation.

4.

Deletion of references to group 7 primary containment isolation valves in TS Table 3.3.2-1.

ADMINISTRATIVE INFORMATION Enclosed are TS pages with the requested revisions indicated by vertical lines in the right-hand margins. We have evaluated this request in accordance with the criteria in 10 CFR 170.22 and have determined that this submittal constitutes a Class 11 and a Class I license amendment request for Brunswick Unit No. I and Brunswick Unit No. 2, respectively. Therefore, our check for $1,600 is enclosed in payment of the required fees.

Since these analog instruments are being installed in Brunswick Unit No. I during the refueling outage which is now in progress, we request your early review of this request and issuance of the requested Brunswick Unit No. I revisions by April 1, 1963. These analog instruments for Brunswick Unit No. 2 will be installed during the upcoming extended maintenance outage, currently scheduled for fall 1983. The proposed Brunswick Unit No. 2 revisions should not be issued until that time; therefore, we will apprise you at a later date of the schedule needed for issuance of Brunsvick Unit N. 2o revisions.

l L

D. B. Vassallo Should you have any questions concerning this submittal, please contact our staff.

Yours very truly, L. W. Eury Senior Vice President Power Supply WRM/pgp (6037C8T2)

Enclosures cc:

Mr. D. O. Myers (NRC-BSEP)

Mr. J. P. O'Reilly (NRC-RII)

Mr. S. D. MacKay (NRC)

L. W. Eury, having been first duly sworn, did depose and say that the information contained herein is true and correct to his own personal knowledge or based upon information and belief.

M B'2fCs4 Notary (Seal)

/

My commission expires: OCT 041986 d'f""'r

\\N

=

l

=

! !#oTAa ri i

i "t10 t. t C l 5

c

  • *.....e #. ** b 6

/*

00Jt6D'%*

i

'rorusun *o o

y._.

..._r.

,_