Monthly Operating Repts for Apr 1995 for Peach Bottom Units 2 & 3
ML20083M537
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/30/1995
From: Jeffrey W, Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9505190299
Download: ML20083M537 (14)


Text

. . o.e se n. nainey Vic3 PrIsident

, 4 ' . Peach Bottom Atomic Power Station Y

PECO ENERGY recoe erovcomnev-RD 1, Box 208 Delta, PA 17314-9739 717 456 7014 May 12,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of April 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, Gerald R. Rainey Vice President, Peach Bottom Atomic Power Station

$ d a W htaXt l GRR'/AJW/GHG/TNM/JGH:wjj enclosures cc: R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland ' l T.T. Martin, Administrator, Region I, USNRC l W.L Schmidt, USNRC, Senior Resident inspector l H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center 1

1S0000 ccn 95-14044 9505190299 950430 y PDR ADOCK 05000277 l R PDR

a J.

, , PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

APRIL 1995 l

l l

UNIT 2  :

Unit 2 began the month of Apr0 at 100% nominal power and operated at that level until April 16th )

when HCU online maintenance began. Power was reduced at various times throughout the i remainder of April to perform the HCU on-line maintenance. HCU on-line maintenance continued l Into May.  !

UNIT 3 i Unit 3 began the month of April at 100% nominal power and operated at that level until April 7th when rod pattem adjustments began in order to compensate for thermal power limitations. Power  ;

was reduced at various times throughout the month to perform rod pattern adjustments. On April  !

21st the unit entered the end of cycle fuel coastdown mode and operated in that mode for the  !

remainder of the month. ]

I I

I i

l l

l

.. 1 1

l l

D s,

Docket No. 50-277 I

, Attachment to i Monthly Operating . ]

Report for April 1995 ,

j UNIT 2 REFUELING INFORMATION H 1. Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 20,1996.

3. Scheduled date for restart following refueling:

Restart following refueling forecast for November 2,1996.

I i

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

'N/A if answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licens!ng action and supporting information:

N/A

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or j supplier, unreviewed design or performance analysis methods, significant changes in fue! design, new operating procedures:

j N/A

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

i (a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2420 Fuel Assemblies,59 Fuel Rods i l

l l

i l

S. c

.,j ,. .

.- , , Docket No. 50-277 Attachment to Monthly Operating Report for April 1995 Page 2 e

UNIT 2 REFUEUNG INFORMATION (Continued)-

8. The present Ilcensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity-September 2002 without fLil core offload capability.

September 1998 with full core offload capability.

.. i gj 4, .

Docket Na'50-278 . ,

' Attachment to Monthly Operating .

Report for April 1995 UNIT 3 REFUELING INFORMATION 9

1. Name of facility:

. Feach Bottom Unit 3 f

2. Scheduled date for next refueling shutdown:

Reload 10 scheduled for September 16,1995  ;

[

3. Scheduled date for restart following refueling Restart following refueling scheduled for October 20,1995
4. Will refueling or resumption of operation thereafter require a technical specification change or other >

license amendment?

l Yes If answer is yes, what, in general, will these be?

93-12 Power Uprate l 93-18 SRM/lRM improvements

5. Scheduled date(s) for submitting proposed licensing action and supporting information:  :

93-12 Submitteo 6/23/93 l 93 18' Submitted 1/17/95

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or f supplier, unreviewed design or performance analysis methods, significant changes in fuel design,  !

new operating procedures:  !

N/A

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies  !

(b) Fuel Pool - 2201 Fuel Assemblies,6 Fuel Rods l

p

_ ._ . .___...-___-______O

1, ..

, , Docket No. 50-278 Attachment to -

MontNy Operating l Report for April 1995 i

. Page 2 UNIT 3 REFUELING INFORMATION (Continued)

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed .l storage capacity that has been requested or is planned, in number of fuel assemblies:  ;

<, The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. .3

9. .The projected date' of the last refueling that can be discharged to the spent fuel pool assuming the

, . present capacity - .

September 2003 without full core offload capability.  :

September 1997 with full core offload capability. -

I l

i i

I l

I I

l l

.]

t 8

AVERAGE DAILY UNIT POWER LEVEL 00CKET NO. 50 277 '

UNIT PEACH BOTTOM UNIT 2'

> , DATE MAY 12,1995-

............................. l COMPANY PECO ENERGY COMPANY W. J. JEFFREY-PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POER STATION .

TELEPHONE (717) 456-7014 EXT 4027 MONTH APRIL 1995

- DAY AVERAGE DA!LY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL-(MWE-NET) (MWE-NET) 1 1122 17 1090 ,

2 1077 18 1006 i 3 1130 19 1040 4 1126 20 1003 1

~ ' '~

5 1133 21 1'0'29 "

6 1108 22 1116 .

7 1124 23 1095-8 1120' 24 1045 9 1120 25 1047 l

10 1120 ti 1047  ;

11 1120 27 1002 r i

12 1116 28 1039 13 1120 29 1104 14 1124 30 1108 15 1126 16 1096 [

i i

-l

,, ,.n,, e - ---e--. . , - , , , .- . .-- , ,

,f  :

v -

AVERAGE DAILY UNIT POWER LEVEL : >

.1 .

DOCKET No.' 50 - 278 .

............................. ~s. .!

UNIT PEACH BOTTOM UNIT 3 -

DATE MAY.-12,1995 COMPANY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY

$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION

. TELEPHONE (717) 456-7014 EXT. 4027 MONTH APRIL 1995 i DAY AVERAGE DA!LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE NET). (MWE NET)

  • 1 -1050 17 1022 2 1013 18 1018 3 1053.' 19 1020 4' 1053 20 1012

~

5 1054 21' '100 6 1037 22 1022 l 7 1040 23 1021 -!

8 1037 24 1023 9 .1037 25 1015 10 1036 26 1024' 11 1040 27 1020 12 1032 28 1017 9

13 1032 29 1013 14 1032 30 1030 ,

15 1026 16 1012 i

)

i

}

I 1

OPERATING DATA REPORT DOCKET NO. 50 - 277 DATE MAY 12,1995 COMPLETED BY PEc0 ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY  ;

$!TE ENGINEERING i PEACH BOTTOM ATOMIC POWER STATION ,

[ TELEPHONE (717) 456-7014 EXT. 4027 OPERATING STATUS 1.. UNIT NAME: PEACH BOTTOM UNIT 2 MOTES:

2. REPORTING PERIOD: APRIL, 1995
3. LICENSED THERMAL POWER (MWT): 3458
4. NAMEPLATE RATING (GROSS MWE): 1221
5. DESIGN ELECTRICAL RATING (NET MWE): TBD

......... [

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDA8LE CAPACITY (NET MWE): th3
8. IF CHANGES OCCUR IN CAPACITY RATINGS (!TEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASCNS:

THE NEW RERATED VALUE FOR ITEM #5 HAS NOT YET BEEN DETERM!NED. ,

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO DATE CUMULATIVE

11. HOURS IN REPORTING PER100 719 2,879 182,519
12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,879.0 116,842.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 3
14. HOURS GENERATOR ON LINE 719.0 2,879.0 112,882.2 1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

............ ............ ............ i

16. GROSS THERMAL ENERGY GENERATED (MWH) 2,430,547 9,875,971 338,196,854 i 17 Gross ELECTRICAL ENERGY GENERATED (FWM) 808,800 3,296,000 111,175,390

)

18. NET ELECTRICAL ENERGY GENERATED (MwH) 783,656 3,211,403 106,653,859 '

l PAGE 1 CF 2

,i

/- , 4.  ;

L OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 277 i

DATE MAY 12,1995 TN!S MONTH ~ YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 100.0 61.9
20. UNIT AVAILABILITY FACTOR 100.0 100.0 61.9 f
21. UNIT CAPACITY FACTOR (USING MDC NET) 99.7 102.0 53.3
22. UNIT CAPACITY FACTOR (USING DER NET) DER RATING TBD 23.' UNIT FORCED OUTAGE RATE 0.0 0.0 12.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

j

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A ,
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73

......... ........ r INITIAL ELECT.$1 CITY 02/18/74 COMMERCIAL OPERA!!ON 07/05/74- t t

t i

r PAGE 2 0F 2 f

f i

.i 2

D' ..

p

~c ,

OPERATING DATA REPORT.

i, DOCKET No. 50 278 DATE MAY 12,1995 . _,

COMPLETED BY PECO ENERGY COMPANY,

-W. J. JEFFREY PERFORMANCE AND RELIABILITY - I SITE ENGINEERING  !'

' PEACH BOTTOM ATOMIC POWER STAT 10N TELEPHONE (717) 456 7014 EXT, 4027 OPERATING STATUS-

.1., UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:

.................................. I

2. REPORTING PERIOD: APRIL, 1995 l

........................... 4

3. LICENSED THERMAL POWER (MWT): 3293 '
4. NAMEPLATE RATING (GROSS MWE): 1152
5. DESIGN ELECTRICAL RATING (NET MWE): .1065

......... W

6. MAXIMUM DEPENDABLE CAPACITY (GROS $ MWE): 1098
7. max! MUM DEPENDABLE CAPACITY (NET MWE): 1035 t
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: '
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):  ;
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO DATE CUMULATIVE ,

11. HOUR $ IN REPORTING PERIOD 719 2,879 178,415
12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,809.5- 116,068.9 13.~ REACTOR RESERVE SHUTDOWN HOURS 0.0 - 0.0 0.0 ~!

2,795.0

~

14. HOURS GENERATOR ON L!NE 719.0 112,674.2

............ ............ ............ 1

15. UNIT RESERVE SHUTDOWN HOURS 0.0 . 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWM) 2,350,082 9,037,858 335,611,801 l
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 767,800 2,972,600 110,118,632
18. NET ELECTRICAL ENERGY GENERATED (MWH) 740,258 2,869,558 105,710,917 -1 PAGE 1 0F 2 i

-i l

1 l

l 1

1 l

i i

~ . . , , , . , ,. ,-

1 i

s. + i l

+ l OPERATING DATA REPORT (CONTINUED) DOCKET No. 50 278 J

............................. j DATE MAY-12,1995 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 97.6 63.1
20. UNIT AVAILABILITY FACTOR -- 100.0. 97.6: 63.1
21. UNIT CAPACITY FACTOR (USING IOC NET) 99.5 .- 96.3 57.2
22. UNIT CAPACITY FACTOR (USING DER NET) 96.7- 93.6 55.6

^

23. UNIT FORCED OUTAGE RATE 0.0 2.9 11.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/14/95
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ' FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY h/0k/7k -

'^

12/23/74

~

COMMERCIAL OPERATION a,

PAGE 2 0F 2

- gg~ .-

i k

UNIT SHUTDOWNS AND POWER REDUCTIONS. ' DOCKET No. 50 - 277 UNIT NAME PEACH BOTTON UNIT 2 DATE MAY 12,1995 REPORT MONTH APRIL, 1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC PC6ER STATICN TELEPHONE (717) 456-7014 EXT. 4027 METHOD OF LICENSEE STSTEM COMPONENT CAUSE AND CORRECTIVE TTPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO No. DATE (1) (HOURS) (2) REACTOR (3) . REPORT # (4)[ (5) jPREVENTRECURRENCE 7 950416 -s 338.0 B 4 RB CRORVE HCU ON ,LINE MAINTENANCE. REACTOR NOT SHUTDOWN

~ __

338.0 l

(1) (2) (3) (4)

F - FORCED REASON ' METHOD EXHIBIT G - INSTRUCTICAS S SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENS!!

C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG 0161)

E OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT ! - SAME SOURCE 1

1 u

i l

l

_._____m

w. . .

. t[ ,:.

e 1 .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 - 278- l UNIT NAME PEACH BOTTOM UNIT 3 DATE MAY 12,1995 REPORT MONTH APRIL, 1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY  ;

SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION' TELEPHONE (717) 456-7014 EXT. 4027 METH00 0F LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE . ACTION TO ,

NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 5 950407 S 349.0 M 4 RS CONROD R00 PATTERN ADJUSTMENTS. REACTOR NOT SHUTDOWN 6 950421 S 218.0 H 4 RC FUELXX FUEL COASTDOWN. REACTOR NOT SHUTDOWN 567.0 (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G INSTRUCTIONS S SCHEDULED A EQUIPMENT FAILURE (EXPLA!N) 1 - MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 OTHER (EXPLAIN) FILE (NUREG 0161)

E - OPERATOR TRAINING + LICENSE EXAMINAT!DN F - ADMIN!$TRATIVE (5)

G OPERATIONAL ERROR (EXPLAIN)

H OTHER(EXPLAIN) EXHIBIT 1 - SAME SOURCE I