OPERATING DATA REPORT DOCKET NO. 50-269 i
DATE 04-13-84 CO.\lPl.E1ED BY J.A. Reavis TELEPilONE 704-373-7567 OPERATING STATUS Oconee 1 Notes
- 1. Unit Name:
- 2. Reporting Period: blarch 1.1984 - blarch 31, 1984 Year-to-date and cumulative 2568 capacity factors are calcu-
- 3. Licensed Thermal Power (51Wt):
934 lated using a weighted
- 4. Nameplate Rating (Gross SIWE):
886 amage h mh
- 5. Design Electrical Rating (Net 31We):
dependable capacity.
- 6. Sf aximum Dependable Capacity (Gross alWe): 899
- 7. Slaximum Dependable Capacity (Net SIWE): 860 S. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Give Reasons:
None 1
- 9. Power Leve! To Which Restricted,if Any(Net S!We): M=
- 10. Reasons For Restrictions.lf Any:
This 3.onth Yr. to Date Cumulative C
- 11. Hours in Reporting Period 744.0 2 184.0 93 889.0
- 12. Number Of Hours Reactor Was Critical 725.2 2 165.2 66 705.7
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 721.1 2 161.1 63 550.5
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (SIWH) 1 829 551 5 526 408 151 824 440
- 17. Gross Electrical Energy Generated (.ilWH) 642 590 1 940 070 52 808 300
- 18. Net Electrical Energy Generated (5tWH) 614 961 1 856 076 30 022 527
- 19. Unit Service Factor 96.9 99.0 67.7
- 20. Unit Asailability Factor 96.9 99.0 67.7
- 21. Unit Capacity Factor (Using SIDC Net) 96.1 98.9 61.8
- 22. Unit Capacity Factor (Using DER Net) 93.2 96.0 60.1
- 23. Unit Forced Outage Rate 3.1 1.1 17.0
- 24. Shutdowns Scheduled Over Nest 6 Stonths (Type. Date, and Duration of Each t:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test StatusIPrior to Commercial Operation): Forecast Achiesed s INITIAL CRITICALITY ,_.
INITIA L ELECTRICITY CO\lstERCIA L OPER ATION (4/77) 0 $9 R pm ,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-269 UNIT Oconee 1 DATE 04-13-84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 i MONTH March 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne t) 1 749 17 869 2 -
18 871 3 625 870 19 4 870 20 820 5 870 21 870 6 870 22 871 7 819 23 871 8 869 24 871 9 870 25 871 10 870 26 871 ,
11 870 27 870 12 870 28 870 13 870 29 869 14 871 30 870 l 15 864 31 870 16 870 l
INSTRUCTIONS on this format, list the average daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
a
t DOCKET NO. 50-269 .
1:NITSIIUTDOWNS AND POWER REDUCTIONS Oconee 1 I UNIT NAbf E DATE L/13/84 COMPLETED NY 0.A. Reavis Kl: PORT MONTil March, 1984 704-373-7567 TELEPIIONE l
- . c L. thee E
._E 3g 3
j
$ E5 jg&
Licensee Evens
,Eg 3,3 e.?
Cause & Courective Actiim to i
l
.$E ac
~
j ;p, g Repmt e in U
}' Prevens Recurrence 6
I 84-03-02 F 22.87 D 1 CE ZZZZZZ "A" Core Flood Tank Boron Conc.
out of spec. .
l 4p 84-03-07 F - A -
HJ PIPEXX Repair "E" Bleed Steam Extraction Line 5-p 84-03-15 F - A -
AA VALVEX Condensate Coolers Bypass Valve Failed Closed 6-p 84-03-20 F --
A - RB CRDRVE Runback due to loss of group two l control rod out indication.
j .
m.
I 2 .
3 4 F: F.=ced Reawm: Efeshist: Exhibit G . Instructiims 5: Scimluled A4iguiposeen Failure (Explain) I-Manual for Preparaliini of Data B-Maissemance or Test 2-Manual Scram. Entey Slicens for Licensee C.Refueinig -
J-Autoinatic Scram. Event Repint (LERI Fde (NilREG-D-Regulaeury Itesetictiswi 4-Oaher (Emplain) 01bil 1:4)pe.aeor Training 1 License Emaniinasiim F-Adanisestrative 5 G-Opciasiinial b ear (Espir.in t Esinibit t .Sanw Sousee r8(77) Il4) elect (L splain) l
. ,. =- .-
i DOCKET NO: 50-269 UNIT: Oconee 1 DATE: 4/13/84 l
l NARRATIVE
SUMMARY
Month: March 1984 l Oconee Unit 1 started the month at 100% but shut down on 2 March 1984 due to the inadvertant dilution of Core Flood Tank A. The unit was back on line at 23:45, 2 March 1984.
On 7 March 1984, the unit dropped load by 10% to fix a steam leak on "E" Bleed System Extraction line and returned to 100% later that day.
The unit ran at 100% until 15 March 1984, when a condensate valve failed closed, causing a low Condensate Booster Pump suction pressure. Because of chemistry considorations, power was dropped to 95%, but returned to 100% that day. .
The unit received a runback to 55% on 20 March 1984, because of a loss of indication l
of a rod on the Rod Control System. The problem was one of indication only, and t the unit was back to 100% at 1828, 20 March 1984.
The unit ran at 100% for the rest of the month.
t l
l l
l l
l l
l l
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 1 .
- 2. Scheduled next> refueling shutdown: February 1985 .
- 3. Scheduled restart following refueling: April 1985 .
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of fuel assemblies (a) in the core 177 .
(b) in the spent fuel pools 1121* .
- 8. Present licensed fuel pool capacity: 1312 .
Size of requested or planned increase NA .
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991 .
DUKE POWER COMPANY Date: April 13, 1984 .
Name of Contact J. A. Reavis Phones 704-373-7567
OPERATING DATA REPORT DOCKET NO. 50-270 DATE 04-13-84 CO.\ lPLETED BY J.A. Reavis TELEP110NE 704-373-7567 OPERATING STATUS Oconee 2 Notes
- 1. Unit Name:
- 2. Reporting Period: March 1, 1984-March 31, 1984 Year-to-date and cumulative
- 3. Licensed Thermal Power (31Wt): N9 capacity factors are calcu-
- 4. Nameplate Rating (Gross 31We): 934 lated using a weighted
- 5. Design Electrical Rating (Net alWe): 886 average for maximum
- 6. Stasimum Dependable Capacity (Gross alWe): 899 dependable capacity.
860
- 7. 31aximum Dependable Capacity (Net 31We):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted. lf Any (Net alWe): None
- 10. Reasons For Restrictions. lf Any:
This 31onth Yr..to.Date Cumulative
- 11. llours In Reporting Period 744.0 2 184.0 83 809.0
- 12. Number Of Houn Reactor Was Critical 744.0 2 184.0 59 497.5
- ~ ~
- 13. Reactor Reserve Shutdown flours
- 14. Hours Generator On Line 744,0 2 184.0 58 344.2
- 15. Unit Resene Snutdo vn flours - - -
- 16. Gross Thermal Energy Generated (alWII) 1 914 657 5 614 143 138 104 810
- 17. Gross Electrical Energy Generated (\lWil) 659 230 1 938 730 47 043 586
- 18. Net Electrical Energy Generated (31Wil) 632 817 1 860 482 44 672 051
- 19. Unit Service Factor 100.0 100.0 69.6
- 20. Unit Availability Fsetor 100.0 100.0 69.6
- 21. Unit Capacity Factor (Using 31DC Net) 98 9 99.1 61.8
- 22. Unit Capacity Factor (Using DER Net) 96.0 96.2 60.2
- 23. Unit Forced Outage Rate 0.0 0.0 16.0 21, Shutdowns Scheduled Over Next 6 Stonths (Type. Date,and Duration of Eacht:
None
- 23. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status tPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITI A L ELECTRICITY CO\l.\lERCI \ L OPER ATION (0/77)
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO. 50-270 UNIT Oconee 2 DATE 04-13-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 ,
MONTH March 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l -(MWe-Net) (MWe-Ne t)
L 1 853 17 830 !
2 845 18 852 ;
3 851 19 853 i
j 4 854 20 852 I 5 854 21 852 6 854 22 851 7 854 23 851 8 850 24 851 9 844 851 25 10 847 26 851 11 852 851 27 12 852 28 851 13 852 851 29 14 852 851 30 15 852 851 31
, 16 853 l
i .r lNSTRUCTIONS On in thethlsreporting format, 1Ist the average dally unit power level in NWe-Net for each day month. Compute to the nearest whole megawatt.
t c
I
...__.m
DOCKET NO. 50-270 UNITSilUTl) OWNS ANI) POWER HEI)UCilONS Oconee 2 UNIT NAME l) ATE 04/13/84 COMPLETEE) RY J. A Reavis REPORT MONTil March, 1984 704-373-7567 TELEPilONE
":.: e 4
i,5 g 3 j E5 Licensec {-r, E*, Caisse & Coereenive
.%. Ikste h 3y j j j cE Even 3,3 !.? Acts.we so
>- 5O f5 as 5 ;f,
- s. =2 Repeat e in U u
Psevent Recurrenice 6
4-p 84-03-16 S --
-B -
CC VALVEX Turbine and Control Valve Movement Tests l
i s
. t l
i i
l .=
l I 2 . J 4 F: F.nad Reawm: Method: Ez'iihis G Instructi ms
! 5; SclwJuicJ A.ligesipment Failwe(Explain) . I-Manual for Picpasasi.m of i). :a
- . . R-Maisesenasade of Test 2-Manual Scram. Enity Slicens for I.seensec
! C.Rc(weling J.Ausanatic Scram. Event Rep wi (1.ER) File INtlREG.
l I)-Reguias.wy Resstictiem . 4-Oslece (Explaini 01611 ;
i E4)pe.asor Training & License Examinations .
i F-Adasinissrasive 5 l~ G41peiasiasial Ess w IExplaint Eshibit I Same Simsee
- raf77) - Il4)eher IExplain) -
i !
i - i j .
_ _ . ~ . __ .
r 1
l DOCKET NO: 50-270 UNIT: Oconee 2 l DATE: 4/13/84 NARRATIVE
SUMMARY
l l
Month: March 10AA
! Oconee Unit 2 ran at 100% for the entire month, except for 16 March 1984,
! when power was reduced to 85% for~a valve movement test for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
(
l
_.__,_____._._____.m.__._______.._.__...___________m
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 2 .
- 2. Scheduled next refueling shutdown: June 1985 ,
- 3. Scheduled restart following refueling: August 1985 ,
l i
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes ,
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Connittee regarding unreviewed safety questions? N/A .
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A ,
- 6. Important licensing considerations (new or different design or supplier, r
unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of fuel assemblies (a) in the core 177 .
(b) in the spent fuel pools 1121* .
- 8. Present licensed fuel pool capacity: 1312 .
Size of requested or planned increase N/A .
i 9. Projected date of last refueling which can be accommodated by present i licensed capacity: August 1991 .
Dates April 13. 1984 ,
DUKE POWER COMPANY Name of
Contact:
J. A. Reavis Phones 704-373-7567
OPERATING DATA REPORT DOCKET NO. 50-287 DATE 04-13-84 CO31PLETED BY J A. Reavis TELEPil0NE 704-373-7567 OPERATING STATUS
- 1. Unit Name: ocome 3 Note 5
- 2. Reporting Period: hfarch 1.1984 - March 31,1984 Year-to-dato and cumulative
- 3. Licensed Thermal Power 15tht): 2568 capacity factors are calcu-
- 4. Nameplate Rating (Gross SIWE): 934 lated using a weighted
- 5. Design Electrical Rating (Net SIWE): 886 amage for madmum 899 dependable capacity.
- 6. Stasimum Dependable Capacity (Gross $1We):
- 7. $lasimum Dependable Capacity (Net MWe): 860
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:
Nono
- 9. Power Level To Which Restricted. lf Any (Net 31We):
- 10. Reasons For Restriellons.If Any:
This Stanth Yr..to.Date Cumulative
- 11. Ilours in Reporting Period .0 2 W .0 M G.0
- 12. Number of flours Reactor Was Critical 180.7 1 619.6 58 329,4
- 13. Reactor Reserve Shutdown flours
- 14. Ilours Generator On.Line 178.5 1 615.5 57 198.1
- 15. Unit Resene Shutdown flours - - -
- 16. Gran Thermal Energy Generated (MWil) 377 668 4 048 036 139 540 600
- 17. Gross Electrical Energy Generated (.\lWil) 1in 1Rn 1 307 9RD .1R 712 144
- 18. Net Electrical Energy Generated (MWil) 171 319 1 337 195 45 904 313
- 19. Unit Service Factor 7.1_ n 74.0 70.2
- 20. Unit Availability Factor 24.0 74.0 70.2
- 21. Unit Capacity Factor (Using MDC Net) 19.0 71.2 05.3
- 22. Unit Capacity Factor (Using DER Net) 1 R of 60.1 63.6
- 23. Unit Forced Outage Rat, 0.0 0.2 14.8
- 24. Shutdowns Scheduled Oier Nest 6 Month (Type.Date.and Duration of Eacht:
Currently Refuniing
- 25. If Shul Down At End Of Report Period. Estimated Date of Startup: May 18, 1984
- 26. Units in Test Status iPrior lo Commercial Operationi: Forecast Achined INITI \ L CRITICALITY INITIT L ELI:CT RIClf Y CO\l\l[RCITL OPER A TION (9/77i
_ .. ~. _- - _ _ _ _ .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-287 4
UNIT Oconee 3 :
1 j DATE 04-13 -84 COMPLETED BY J.A. Reavis .;
- TELEPHONE 704-373-7567 i MONTH March 1984 DAY -AVERAGE DAILY POWER LEVEL DAY 2 AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Ne t)
I 853 -
17
! 2 853 18
~
e 3 853 ~
19 4 853 20
~
5 776 21
~
l.
6 406 22
~
t 7 408 ~
23
{ 8 151 24
~
4
- ~~
i 9 25 10 -
26
~
l 11 27
~
1
~
12 -
28 i
h 13
- ~
29
- ~
14
{ 30 ;
! 15 31 16 1
4 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for_ each day
- in the reporting month. Compute to the nearest whole megawatt.
k i
I E IfNITSilUTDOWNS AND POWER REDUCilONS Oo 3 -
.NA E DATE 04/13/84 COMPLETED BY J. A. Reavis REPORT MONTil Mareh 14R4 TELEPilONE 704-373-7567
- E E
-, .$ E 3 $ E5 Licensee h {% Cause & Cos receive No. Date y, 3g i jg& Evens sy e.? Aciiim en W
fE d 5 ;p, g Repin a in O u
5O Prevens Recurrence '
5 O
2-p 84-03-05 S --
H -
RC ZZZZZZ Economic Dispatch 2 84-03-08 5 565.48 C - RC FUELXX End of Cycle 7 Refueling Outage i
I 2 3 4 F: Fini:ed Reaum: Method: Exhihis G -Instructiims S: S.;heduled A-liguipsnent Failure (Explain) 1-Manual for Picparasiim of I)2:a H-Maintenance of Tes 2-Manual Scram. Eni:y SIweis for lxensee C-Refueling 1-Automatic Scram. Event Repius (t.ER1 File INtlRI.G-D-Regulatiwy Ressiiciiim 4-Oeher (Explaini 01bil
[ l'4):maior Training & Ixenw Examinatism F-Administrative 5 G4)pciasiemal Ensur IEsplain) Eshibis ! -Sanw Simsec l (9/77) Il-(hher IExplain)
O W
DOCKET No:- 50-287 UNIT: Oconee 3 DATE: 4fl3/84 NARRATIVE
SUMMARY
l Month: March to,qa Oconee 3 began the month at 100%, reduced load on 5 March 1984 to 50% per Dispatcher request and shut down on 8 March 1984 for a refueling outage.
The unit is scheduled to be on-line on 18 May 1984.
8 I
l i
l
- HONTHLY REFUELING INFORMATION REQUEST
- 4 7
Oconce Unit 3 ; f
- 1. Facility name:
/~
- 2. Scheduled next refueling shutdown: Curi &tly Refueling ._._ .. . ,j-- ,
Scheduled restart following refueling: Hay 18, 1984 /
- 3. .
- 4. Will refueling or resumption of operation thereaf ter reqdire a technical '
specification change or other license amendment? Yun .
~'
If yes, what will these be? Technical SpecfficatIIin havinson q 1 t
-~.
-'l ,
1 _
~ .,
- + ,a a I -
' . w.
,- ~ ~
,,8'B4 58* ..
. . - 'nn 4 f
^
If no, has reload design and core configuration been sevt wed b) Mf/*y '
Review Committee regarding unreviewed safety questionst. N /A ..
, ~
- e. -
- 5. Scheduleddate{s for submitting proposed licensing action asid e6pportiiig '
information _
- 6. Important licensing considerations (new or dittarent deaf.so or supplier '~ ,
unreviewed design or performance analysis methods, st3aittiant chan,tes in '
design or new operating procedures). _'_ _
-s
~
, .R <
n n --, -
s ,
l '
175 v l 7. Number of fuel assemblies (a) in the core: _
(b) in the spent fuel pool 72 m. -~
~ .-
- 8. Present licensed fuel pool capacity: 825 e~ ~ ~
Size of requested or planned increase N/A _
i -
- 9. Projected date of last refueling which can he ne5Camodated t) prkannt ' .
licensed capacity: August 1991 -
.s ,
l -
c .
, .x DUKE POWER COMPANY Daae AprilId,196ti ~~ ~
.' /*
e Name of
Contact:
J. A. Reavis Phoid: 704-373-7567 -
- e ,
, , \
. e ,
p' 8 su, # '
e l'
~
4
.s
- )
~
, ' * + ,'
.~.,
OCONEE NUCLEAR STATION j Operating Status Report
~i,
- df 1. Personnel Exposure
. For the month of February, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
- 2. The total station liquid release for February has been i compared with the Technical Specifications annual value L- - of 15 curies; the total release for February was less l
than 10 percent of this limit.
[ The total station gaseous release for February has been l con. pared with the derived Technical Specifications annual l value of 15,000 curies: the total release for February l/ was less than 10 percent of this limit.
I '
e i
l l
9
'.'~..
n l[
l I
,/ t l#
s-f
e DUKE POWER GOMPAhT .
P.O. HOX 33180 CIIAltLOTTE, N.C. 28242 HALII. TUCKER EFIIONE
,,w ,.. April 13, 1984 (m)on4=
NtELEAR PSOptTTIO15 b
Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission i Washington, D. C. 20555 Attention: Document Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287
Dear Sir:
\
Please find attached information concerning the performance and operating
status of the Oconee Nuclear Station for the month of March 1984. ,
Very truly yours,
& k. ~
Hal B. Tucker '
JAR:scs '
t Attachments-cc: Regional Administrator 'Ms. Helen Nicolaras,, Project Manager U. S._ Nuclear Regulatory Commission Office of Nuclear Reactor-Regulation Region II- U. S. Nuclear Regulatory Commission 101'Marietta Street, NW, Suite 2900 Washington, D. C. 20555 Atlanta, Georgia 30303 Mr. Phil Ross .
-INPO Records Center '
U. S. Nuclear Regulatory. Commission Suite 1500 MNBB-5715 1100 Circle-75. Parkway Washington, D. C. 20555 Atlanta, Georgia 30339 Senior Resident Inspector ~
-Oconee Nuclear Station 5%
. i e -
)
- 4