l AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-311 Unit Name Salem # 2 l
Date April 10, 1984 l
Completed by L.
K. Miller Telephone 609-935-6000 l
Extension 4455 Month March 1984 Day Average Daily Power Level Day Average Daily Power Level l
(MWe-NET)
(MWe-NET) 1 0
17 977 2
0 18 1014 3
0 19 1003 4
0 20 1049 5
404 21 1095 l
6 870 22 1008 7
92 23 837 8
1007 24 698 9
1011 25 1048 10 1086 26 1050 11 1094 27 1082 12 1098 28 1113 13 1106 29 1024 14 1042 30 978 15 1058 31 989 l
16 1058 Pg. 8,1-7 R1 l
l i
O!
!g A
PM Page 2 of 12
)
-n
-)
OPERATING DATA REPORT i
Docket No. 50-311 Date April 10, 1984 Telephone 935-6000 Completed by L. K. Miller Extension 4455 Operating Status 1.
Unit Name Salem No. 2 Notes 2.
Reporting Period March 1984 3.
Licensed Thermal Power (MWt) 3411 4.
Nameplate Rating (Gross MWe) 1162 5.
Design Electrical Rating (Net MWe)
ITT3 6.
Maximum Dependable Capacity (Gross MWe)1149 7.
Maximum Dependable Capacity (Net MWe) 1106 8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A l
l 9.
Power Level to Which Restricted, if any (Net MWe)
N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 2184 21650 l
- 12. No. of Hrs. Reactor was Critical 722.4 741.1 12449.6 i
- 13. Reactor Reserve Shutdown Hrs.
21.6 1443 2789.6
- 14. Hours Generator On-Line 649 649 12066.3
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (bHGI) 2059562 2064441 35535513
- 17. Gross Elec. Energy Generated (MMI) 670500 670500 11538790
- 18. Net Elec. Energy Generated (MWH) 638998 620300 10937548
- 19. Unit Service Factor 87.2 29.7 55.7
- 20. Unit Availability Factor 87.2 29.7 55.7 t
j
- 21. Unit Capacity Factor (using MDC Net) 77.7 25.7 45.7 l
- 22. Unit Capacity Factor (using DER Net) 77.0 25.5 45.3
- 23. Unit Forced Outage Rate 12.8 70.3 33.1
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
N/A t
1
- 25. If shutdown at end of Report Period, Estimated Date of Startup N/A l
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved Initial Criticality 6/30/80 8/2/80 l
Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2 l
l Page 3 of 12 l
U
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-311 REPORT MONTH March 1984 Unit Name Sala No.2 Date April 10, 1984 Completed by L.K. Miller Telephone 609-935-6000 -
Extension 4455 Method of Duration Shutting License Cause and Corrective No.
Date Type Hours Reason Dcwn Event System Component Action to 1
2 Rea ctor Report Code 4 Code 5 Prevent Recurrence Stator Core HA GENERA
~
Iron Generator 84-010 01-01 F
95.0 A
4 Stator Core HA GENERA Iron Generator 84-016 03-04 F
7.0 A
4 Stator Core HA GENERA Iron Generator 84-018 03-05 F
2.0 A
4 Steam Generator Feed 84-020 03-05 F
11.7 A
5 HI PUMPXX Pump Problems Main Stop HA VALEX Valves Turbine 84-022 03-06 F
6.3 B
5 Condenser Tube and 84-024 03-07 F
3.6 B
5 HC HTEXCH Water Box Cleaning Liquid Cooling HA HTEXCH System Generator 84-026 03-07 F
2.7 B
5 Condenser Tube and 84-028 03-07 F
3.2 B
5 HC HTEXCH Water Box Cleaning Main Stop 84-030 03-07 F
6.7 B
5 HA VALVEX Valves Turbine Condenser Tube and 84-032 03-07 F
3.4 B
5 HC HTEXCH Water Box Cleaning Feedwater LP Heater HC HTEXCH Tube Leaks84-034 03-08 F
6.9 A
5 Stator Windings Terminals Bushings84-036 03-08 F
554.8 A
5 HA GENERA Generator 1
2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram.
for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report l
G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) i l
Page 4 of 12
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-272 REPORT MONTH MARCH 1984 Unit Name Salem No.2 Date April 10, 1984 Completed by L.K. Miller Telephone 609-935-6000.
Extension 4455 Method of Duration Shutting License Cause and Corrective No.
Date Type Hours Reason Down Event System Component Action to 1
2 Rea ctor Report Code 4 Code 5 Prevent Recurrence Condenser Tube and 84-038 03-08 F
3.9 B
5 HC HTEXCH Water Box Cleaning Condenser Tube and HC HTEXCH Water Box Cleaning 84-040 03-09 F
2.4 B
5 Condenser Tube and HC HTEXCH Water Box Cleaning I
84-042 03-10 F
3.0 B
5 Traveling Screen /
Trash Rack /
HF FILTER Canal Screen S4-044 03-12 F
28.2 B
5 Condenser Tube and HC HTEXCH Water Box Cleaning 84-046 03-14 F
3.1 B
5 Traveling Screen /
Trash Rack /
HF FILTER Canal Screen 84-048 03-14 F
1.6 B
5 Condenser Tube and i
84-050 03-15 F
6.0 B
5 HC HTEXCH Water Box Cleaning l
Condenser Tube and HC HTEXCH Water Box Cleaning 84-052 03-16 F
2.4 B
5 Other Circulating Water System HC HTEXCH Problems84-054 03-16 F
5.2 B
5 Condenser Tube and HC HTEXCH Water Box Cleaning 84-056 03-16 F
12.2 B
5 Traveling Screen /
i Trash Rack /
HF FILTER Canal Screen 84-058 03-17 F
6.4 B
5 1
2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 l
F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as l
S: Scheduled B-Maintenance or Test 2-Manual Scram.
for Prepara-Source C-Pefueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Icad Reduction Event Report G-Operational Error-explain 9-Other (LER) File l
H-Other-explain (NUREG 0161)
Page 5 of 12
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-272 REPORT MONTH MARCH 1984 Unit Name Salen No.1 Date April 10, 1984 l
Completed by L.K. Miller Telephone 609-935-6000.
Extension 4455 i
I Method of Duration Shutting License Cause and Corrective Co.
Date Type Hours Reason Down Event System Component Action to 1
2 Reactor Report Code 4 Code 5 Prevent Recurrence 1
Condenser Tube and 84-060 03-17 F
11.0 B
5 HC HTEXCH Water Box Cleaning Condenser Tube and 84-062 03-18 F
3.4 B
5 HC HTEXCH Water Box Cleaning Condenser Tube and 84-064 03-19 F
3.4 B
5 HC HTEXCH Water Box Cleaning Condenser Tube and 84-066 03-19 F
4.1 B
5 HC HTEXCH Water Box Cleaning l
Condenser Tube and 84-068 03-20 F
3.2 B
5 HC HTEXCH Water Box Cleaning Ccndenser Tube and 84-070 03-20 F
14.8 B
5 HC HTEXCH Water Box Cleaning Condenser Tube and HC HTEXCH Water Box Cleaning 84-072 03-21 F
2.6 B
5 j
Condenser Tube and l
84-074 03-21 F
4.5 B
5 HC HTEXCH Water Box Cleaning l
Condenser Tube and 84-076 03-21 F
3.5 B
5 HC HTEXCH Water Box Cleaning Condenser Tube and 84-078 03-22 F
1.6 B
5 HC HTEXCH Water Box Cleaning Feedwater Heater 84-080 03-22 F
11.5 B
5 HC PUMPXX Drain Pumps Feedwater Heater HC PUMPXX Drain Pump l
84-082 03-23 F
25.6 B
5 Traveling Screen /
Trash Rack /
84-084 03-23 F
3.1 B
5 HP FILTER Canal Screen 1
2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as l
S: Scheduled B-Maintenance or Test 2-Manual Scram.
for Prepara-Source C-Refueling 3-Automatic Scram, tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (N
61)
Page 6 of 12
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-272 REPORT MONTH MARCH 1984 Unit Name Salem No.1 Date April 10, 1984 Ccmpleted by L.K. Miller Telephone 609-935-6000 Extension 4455 Method of l
Duration Shutting License Cause and Corrective No.
Date Type Hours Reason Down Event System Component Action to 1
2 Rea ctor Report Code 4 Code 5 Prevent Recurrence Steam Generator Feed 84-086 03-23 F
6.5 B
5 HI PUMPXX Pump Speed Control Feedwater Heater 84-088 03-24 F
8.2 B
5 HC PUMPXX Drain Pump Steam Generator Feed 84-090 03-24 F
9.2 B
5 HI PUMPXX Pump Speed Control Feedwater Heater 84-092 03-24 F
34.4 B
5 HC PUMPXX Drain Pump Steam Generator Feed j
84-094 03-24 F
0.4 B
5 HI PUMPXX Pump Speed Control Traveling Screen /
Trash Rack /
84-096 03-25 F
4.7 B
5 HF FILTER Canal Screen Traveling Screen /
Trash Rack /
84-098 03-29 F
11.6 B
5 HF FILTER Canal Screen Traveling Screen /
Trash Rack /
)84-100 03-29 F
0.5 B
5 HP FILTER Canal Screen l
Traveling Screen /
Trash Rack /
84-102 03-29 F
0.5 B
5 HF FILTER Canal Screen Traveling Screen /
Trash Rack /
84-104 03-30 F
1.9 B
5 HF FILTER Canal Screen l
3 Method 4 Exhibit G 5 Exhibit 1 l
1 2 Reason I
F: Forced A-Equipment Failure-explain l-Manual Instructions Salem as l
S: Scheduled B-Maintenance or Test 2-Manual Scram.
for Prepara-Source l
C-Refueling 3-Automatic Scram, tion of Data f
D-Regulatory Restriction 4-Continuation of Entry Sheets l
E-Operator Training & Licensing Exam Previous Outage for Licensee l
F-Administrative 5-Load Feduction Event Report j
G-Operational Error-explain 9-Other (LER) File l
H-Other-explain (NUREG 0161) l Page 7 of 12
UNIT SHUTDOWN AND PCWER REDUCTIONS DockOt No. 50-272 REPORT MONTH MARCH 1984 Unit Name S 11?m No.1 Date April 10, 1984 Completed by L.K. Miller Telephone 609-935-6000 Extension 4455 Method of Duration Shutting License Cause and Corrective Co.
Date Type Hours Reason Down Event System Component Action to 1
2 Reactor Report Code 4 Code 5 Prevent Recurrence Traveling Screen /
Trash Rack /
84-106 03-30 F
0.3 B
5 HP FILTER Canal Screen Condenser Tube and 84-108 03-30 F
2.6 B
5 HC HTEXCH Water Box Cleaning Traveling Screen /
Trash Rack /
84-110 03-30 F
8.0 B
5 HF FILTER Canal Screen Traveling Screen /
Trash Rack /
HF FILTER Canal Screen 84-112 03-30 F
1.7 B
5 Condenser Tube and 84-114 03-30 F
2.5 B
5 HC HTEXCH Water Box Cleaning Condenser Tube and HC HTEXCH Water Box Cleaning 84-116 03-30 F
2.2 B
5 Traveling Screen /
Trash Rack /
84-118 03-31 F
3.7 B
5 HF FILTER Canal Screen Traveling Screen /
Trash Rack /
84-120 03-31 F
4.2 B
5 HF FILTER Canal Screen B roken 84-122 03-31 F
0.9 B
5 HF FILTER Drive Shaft 1
2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram.
for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)
Page 8 of 12
DOCKET NO:
50-311 MAJOR PLANT MODIFICATIONS UNIT NAME:
SALEM 2 REPORT MONTH MARCH 1984 DATE:
APRIL 10, 1984 COMPLETED BY :
L.
K. MILLER TELEPHONE:
(609) 339-4455
,s
- DCR NO.
PRINCIPLE SYSTEM SUBJECT 2EC-1720 Safety Injection Modify the existing 2SJ4 and 2SJ5, 2SJ12 and 2SJ13 valve leakoff connections to facilitate visual inspection of valve stem leakage.
2ET-1786 Safeguard Emergency Install monitoring equipment on Control various components on 2B SEC.
2SC-0325 A-C Power System 230V Change circuit breaker for position SG5 & SG6 from TEC 18/72, 1.5kw, 3.6 amps to TED 20, 4kw, 12 amps for Instrument Panel 361-2A and 361-2B No. 2 Service Water Intake 460V - 230V Control Center.
2SC-0364 Condensate (No. 23 only)
Modify 23 Heater Drain Pump Motor to allow filling of oil reservoir.
O k.-)
l l
i l
P s
- DESIGN CHANGE REOUEST Page 9 of 12 8-1-7.R1
MAJOR PLANT MODIFICATIONS DOCKET NO.:
50-311 REPORT MONTH MARCH 1984 UNIT NAME:
Salem 2 DATE:
April 10, 1984 COMPLETED BY:
L.K.
Miller TELEPHONE:
609/339-4455 DCR NO.
10CFR 50.59 SAFETY EVALUATION 2EC-1720 Implementation of this DCR will not modify the function of any safety related system.
No unreviewed safety or environmental questions are involved.
2ET-1786 This test will not alter any plant process or discharge and will not affect the existing plant impact.
No unreviewed safety or environmental questions are involved.
2SC-0325 Implementation of this DCR will not create any new safety hazards.
No unreviewed safety or environmental questions are involved.
2SC-0364 Implementation of this DCR will affect the operation of the motors and does not involve any change to the FSAR or Technical Specifications.
No unreviewed safety or environmental questions are involved.
- DCR - Design Change Request Page 10 of 12
1 SALEM UNIT 2 OPERATIONS
SUMMARY
REPORT MARCH 1984 Unit No. 2 began the period shutdown as post-maintenance non-synchronized generator testing was successfully completed.
The unit was synchronized on March 4, and attained full power operation on March 9, 1984.
With the exception of minor load reductions on March 16, for turbine valve testing, and March 18, due to temporary loss of 2A Vital Bus, Unit No. 2 continued to operate at full power until March 22.
On March 22, load was reduced to 85% to replace No. 23 Heater Drain Pump Motor.
On March 23, unit load was further reduced to 50% to repair the speed control for No. 21 Steam Generator Feedwater Pump.
Subsequent to the repairs, a power escalation was commenced and the unit was returned to full power en March 25.
Unit No. 2 continued to operate at full power until March 29, when load was reduced to approximately 80% due to circulator screen fouling problems cauced by storm tide conditions.
Unit load remained reduced (85% to 90%) through the remainder of the month as the circulator screens were repeatedly cleaned of grass and debris.
1 1
Page 11 of 12
I REFUELING INFORMATION DOCKET NO.:
50-311 COMPLETED BY:
L.K. Miller UNIT NAME:
Salem 2 DATE:
April 10, 1984 l
TELEPHONE:
609/935-6000 EXTENSION:
4455 Month March 1984 1.
Refueling information has changed from last month:
l YES NO X
2.
Scheduled date for next refueling:
January 5, 1985 3.
Scheduled date for restart following refueling:
March 17, 1985 l
4.
A)
Will Technical Specification changes or other licenso amendments be required?
YES NO NOT DETERMINED TO DATE 4/1/84 L
l B)
Has the reload fuel design been reviewed by the Station l
Operating Review Committee?
YES NO X
l If no, when is it scheduled? November 1984 5.
Scheouled date (s) for submitting proposed licensing action:
December 1984 (if required) 6.
Important licensing considerations associated with refueling:
NONE l
l 7.
Number of Fuel Assemblies:
A)
Incore 193 B)
In Spent Fuel Storage 72 8.
Present licensed spent fuel storage capacity:
1170 Future spent fuel storage capacity:
1170 9.
Date of last refueling that can be diccharged to spent fuel pool assuming the present licensed capacity:
March 2000 8-1-7.R4 Page 12 of 12
O PSEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridqe, New Jersey 08038 Salem Generating Stat:on Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTl!LY OPERATING PEPORT SALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of March 1984 are being sont to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Operating Summary Refueling Information Sincoroly youro, N
J. MY Zu ko, Jr.
General Msnager - Salem Operations LKMisbh cc Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenuo King of Prussia, PA 19406 Director, Offico of Management Information and Program Control U.S. Nucioar Regulatory Commission Waohington, DC 20555 Enclosuron Pago lof 12 8-1-7.R4 gg-AY M,,_,_,