ML20083L753
| ML20083L753 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/12/1995 |
| From: | Marsh W SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-89-10, NUDOCS 9505180592 | |
| Download: ML20083L753 (2) | |
Text
__
i
,f"d5 Southem Califomia Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718
]
May 12, 1995 1.u, WAWER C MARGH u,,.4acam m.m.
a.om mm.n.
m., m.~m J
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Docket Nos. 50-361 Generic Letter 89-10: Safety-Related Motor-Operated Valve Testing and Surveillance San ~0nofre Nuclear Generating Station Unit 2
Reference:
Letter from R. M. Rosenblum (Edison) to the Document Control Desk (NRC) dated January 11, 1990;
Subject:
Docket Nos. 50-361 and 50-362, Generic Letter 89-10: Safety-Related Motor-0perated Valve Testing and Surveillance, San Onofre Nuclear Generating Station Units 1, 2, and 3 This letter is to notify the NRC that Southern California Edison (Edison) has completed the design-basis reviews, analyses,. verifications, tests, and inspections to comply with recommendations (a) through (h) of Generic Letter (GL) 89-10 for San Onofre Unit 2.
Edison initially responded to GL 89-10 by the January 11, 1990, letter, referenced above.
The GL 89-10 motor operated valve testing began during the Unit 2, Cycle 6 refueling outage and was completed during the Unit 2, Cycle 8, refueling outage. A GL 89-10 closure report for Unit 2, dated April 19, 1995, is being retained at San Onofre and is available for your review.
I 9505100592 950512 I
PDR ADDCK 05000361 0
P PDR
l fs(5 Document Control Desk Please let me know if you have any additional questions.
Very truly yours, 4/dh 9 cc:
L. J. Callan, Regional Administrator, NRC Region IV A. B. Beach, Director, Division of Reactor Projects, Region IV i
K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV
)
J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. 8. Fields, NRC Project Manager, San Onofre Units 2 and 3 State of California County of 0Fange San Diego On May 12, 1995 before me, Linda L. Rulon/ Notary Publi9 personally appeared Walter C. Marsh
, personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.
Witness my hand and official seal.
Signature ho d. Ih 5 O Noteiry A+xocaggo,,gg UNDA L RULO,N f couu.,2322 g
I oAANGE county W CC
=
_'m ewtoe wt og,,ggg 6
1 L
]