Text
.
o'*
,f~*[Y Southem Calihmia Edison Company P. O BOX (28 SAN CLEMENTE. CALWORNIA 92674 0128 R. W, MRIEGE R
,E LE PHO N.
.a...n.
May 9, 1995
.oc...........
U.
S.
Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
Subject:
Docket No. 50-361 30-Day Report Licensee Event Report No.95-008 San Onofre Nuclear Generating Station, Unit 2 Pursuant to 10 CFR 50.73(d), this submittal provides the required 30-day written Licensee Event Report (LER) for an occurrence involving Technical Specification 3.0.3 entries due to inoperable containment cooling components.
Neither the health nor the safety of plant personnel or the public was affected by this occurrence or condition.
If you require any additional information, please so advise.
Sincerely, 4
N kr/
er
Enclosure:
LER No.95-008 cc:
L. J. Callan, Regional Administrator, NRC Region IV J.
Dyer, Director, Division of Reactor Projects, Region IV K.
E.
Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A.
Sloan, NRC Senior Resident Inspector, San Onofre Units i
2 &3 M.
B. Fields, NRC Project Manager, San Onofre Units 2 and 3 Institute of Nuclear Power Operations (INPO) 9505150189 950509 PDR ADDCK 05000361 f(1, S
/
-