Clarifies Due Dates for NUREG-0737,Suppl 1 Items Contained in ,Including Detailed Control Room Design Review, Rept on Implementing Reg Guide 1.97 & Fully Functional Technical Svc Ctr/Emergency Offsite Facility
ML20083K325
Person / Time
Site: Oyster Creek
Issue date: 04/09/1984
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8404160135
Download: ML20083K325 (2)


Text

.

GPU Nuclear Corporation Nuclear

= s = r 888 Forked River, New Jersey 08731-0388 609 971-4000 Wnter's Direct Dial Number:

April 9, 1984 Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Eisenhut:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Emergency Response Capabilities j

Supplement 1 to NUREG-0737 l

Reference:

Letter, P.B. Fiedler to D.G. Eisenhut, dated April 15, 1983 The purpose of this letter is to clarify the due dates for three items contained in the reference submittal. The specific items are the summary report of the Detailed Control Room Design Review which should have a date of April, 1984, the final report on implementing the requirements of Regulatory Guide 1.97 the date for which should read May, 1984 and the " fully functional" date for the TSC and EOF. The date for the TSC/ EOF is SPDS dependent and should be the same as the date given for the basic.SPDS installation in Oyster Creek's Revised SPDS Submittal Schedule that was sent to the NRC on March 9, 1984._ The revised schedule states that the basic SPDS Will be available prior to restart from our cycle 11 outage which is presently scheduled to begin in November, 1985. We expect that subsequent enhancements to the SPDS will be made, along with the development of additional software, once the system has been installed and operated.

These clarifications have been discussed with our NRC project manager and are being submitted at this time to allow for their inclusion in the forthccaning Confirmatory Order.

I pFg 8404160135 840409

.a PDR ADOCK 05000219 F_.

PDR.

g y 1.

GPU Nuclear Corporation is a subsidiary of the Genera 1 Public Utilities Corporation

, If you have any questions, please contact me or the Oyster Creek Licensing Manager at (609)971-4643.

Very truly yours, t

i dler Vice President and Director Oyster Creek PBF:M: dam cc:- Mr. J.-Lombardo U.S. Nuclear Regulatory Commission

-7920 Norfolk Avenue.

-' ~

Bethesda, MD 20014 NRC Resident Inspector-1 Oyster Creek Nuclear Generating Station Forked River, W 08731~