.l December 15, 1978 hL.
(.p. o
>p.
Mr. James P. O'Reilly, Director Serial No. 720 Office of Inspection & Enforcement PSELC/JMD:bep/mc yvaf; U. S. Nuclear Regulatory Comission
- d. ;.'(
Region II Docket No. 50-339 gig.
101 Marietta Street, Suite 3100 N,W.:;.
Atlanta. Georgia.
30303 d
t
- a u.
k..$k.g.$
- k
Dear Sir:
On' December 11, 1978, a report was made under the provisions of 10CFR50.55('e) '.$$$
concerning the Service Water Reservoir Spray Headers.
- t
- 1. G In accordance with the reporting requirements of 10CFR21, the following WM information is submitted:
A' ' ~ F A.s Name and address of reporting individual:
W;. &
hs..
Mr. E. A. Baum Executive Manager Licensing and Quality Assurance Virginia Electric and Power Company P. O. Box 26666
[.r
- ..e Richmond, Virginia 23261 u
E-B.
Facility, activity, and/or component affected:
g North Anna Power Station, Unit 2 Y,.),..
.' i Service Water System / Spray Headers
$?.Qi y +.y C.
Name of fim constructing the facility or supplying the component, Q:.g) y activity or service.
-y Stono and Webster Engineering Corporation ie P. O. Box 2325 Boston, Massachusetts 02107 h/$
~D D.
Description of defect, deficiency, or failure to comply:
thjj 6: 'A During high pressure testing of the Unit 2 Service Water Reservoir
{-
Spray System, a break occurred in the 18" and 10" underwater spray piping header.
E.
Date of determination of reportability:
- -U NA-l s.
December 11, 1978
_. ij
&cmamn S
Q n\\
-. -. m.
.i
i
+ -
+
(.*
hi wncmia rucTaic Aso rowna coMPAW TO Mr. James P. O'Reilly SHEET NO. 2 1.
I F.
Similar components, activities, or services:
I4 ~
h' Eb-Spray Header arrangement provided in Service Water Reservoir r
for Units 1, 2, 3 & 4.
' tt'f 4W G.
Corrective action which has been, is being or will be taken, the indi-ifjfR vidual responsible and the length of time to complete the action:
'8y3 c
[h..w Prelininary investigation is proceeding as to the cause and extent of the problem.
T H.
Other information:
Ni r
s v
None r
@ft?'
j:
Any infomation not available at' this time will be submitted in a follow-PkW up letter as a 30-day report.,
Nf t.'!
Should you rcquire furthe'r infonnation, please contact this office.
<c;y r lu b ryl/;truly y
'i.. ^
s
//7 gl )hl YUA Sam C.
rown, Jr.
p@
Vive President - Power St on Engineering and Construc n
-3; c
k.
cc:
Director, Office of Inspection-b'4-f and Enforcement (3)
^
\\.a ?z,
+
~
-x
..y;b2 l '.R*
1G?.i 7i;*y j
~-
/
w
- g.
. a l?
L.ti 4, q.
,7 1
,e.y 6
g, '*.,
-v
.r-p&
P j
L' i
o
'G.
L
-e,
.],
-..z.
- ,~
s
.f^
m
- - - ' - 4 el
-