Addl Testimony of Ha Hutchison Re Cygna Review of Document Control
ML20083K110
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/12/1984
From: Hutchison H
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To:
Shared Package
ML20083K084 List:
References
NUDOCS 8404160068
Download: ML20083K110 (3)


Text

c- .

e f

-t UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TEXAS UTILITIES ELECTRIC ) Docket Nos. 50-445 COMPANY, _e t _a l . ) 50-446 (Comanche Peak Steam Electric ) (Application for Station, Units 1 and 2) ) Operating License)

ADDITIONAL TESTIMONY OF HEYWARD ASGELL HUTCHINSON, JR.

REGARDING CYGNA REVIEW OF DOCUMENT CONTROL Q.l. Please state your name and address?

A.1. My name is Heyward Asgell Hutchinson, Jr. I reside at 1120 Green River Trail, Cleburne, Texas. A copy of my professional qualifications is attached to my written testhmony.

Q.2. You testified earlier that you received a copy of a list of drawings from Cygna on October 24, 1983, and that you gave this list of documents to Dobie Hatley. Is that correct?

A.2. Yes.

'Q.3. Since you last testified, have you investigated what Ms.

. Hatley did with the list?

A'.3. Yes.

Q.4. What did Ms. Hatley do with the list?

kh T

O$

PM 5

.J t

Testimony of Heyward Asgell Hutchinson, Jr. (2)

+

A.4. Ms. Hatley took the list and told the satellites that Cygna would be coming to verify operation of DCC and the satellites.

0 5. What did the satellites then do?

A.S. The satellites checked to make Fure that their filGs and their manual design change logs were current as to the drawings and related design changes Cygna would be using in its verification.

~

Q.6. Did you expect the satellites to do this when you gave Ms. Hatley the list?

A.6. No. I assumed that all the drawings and related design changes Cygna would be reviewing were in the satellites and properly filed. I also assumed that the manual design-change logs in the satellites were current.

4 C

j, Brown & Root, Inc. ,

I HEYWARD ASGELL HUTCHINSON, JR.

Project Control Manager i

SUMMARY

OF EXPERIENCE:

Nineteen years of engineering / construction experience with emphasis on project controls and subcontract / procurement activities.

Scope of work has included management of cost, estimating, scheduling, document control, production control, and procurement departments associated with nuclear power plants. Heavy involvement in procure-ment and controls systems providing direct interface with the client on all control related functions. Currently serving as Project Controls Manager for a nuclear power plant.

PROJECT TYPES: PERSONAL DATA:

Nuclear Power Plants Born December 13, 1943, Columbia, Naval Base South Carolina Prestressed Bridges Major in Engineering, University of Structural Steel Bridge South Carolina, 1962-63 Land Development Engineering Associate, South Carolina Residential Construction Area Trade School,1964 Interstate Highways Briceet Training Seminar, August 1981 Married, three children ACTIVITIES:

-Project Controls Cost & Estimating Scheduling '

i Subcontract Administration Procurement Field Engineering Tank Construction Pre-Construction Planning All Phases of Civil Construction t Production Control Document Control EMPLOYMENT HISTORY:

. Brown & Root, Inc. '1969-73; 1975 to present Queen's: Point Development Corp. 2 Years-Inland Bridge Co. 20 M aths South Carolina Highway Dept. 5 Years SOCIAL SECURITY NO.: 247-70-5207- - May, 1983 e

^J I HEYWARD ASGELL HUTCH!NSON Project Control Manager i DETAILED PROFESSIONAL . EXPERIENCE I f

Brown & Root, Inc. - Since 1969-1973; 1975 to present ,

i Project Control Manager: (3 Years,10 Months)

Directly responsible for all Cost, Estimating, Scheduling, Occument Control, Production Control, Subcontract and Procurement activities.

Texas Utilities Generating Co.; Glen Rose, Texas -

Nuclear power plant - Two Unit 2300 MW plant designed by Gibbs & ,

Hill with construction by Brown & Root, Inc.

Subcontract / Procurement Supervisor: (1hYears)

Texas Utilities Generating Co. ; Glen Rose, Texas -

Responsible for Administration of all Subcontracts and all Purchase Orders for pennanent plant materials.

Subcontract Supervisor: (2 Years)

Texas Utilities Generating Co.; Glen Rose, Texas -

Administration of all Subcontracts and several major Purchase Orders.

Assistant Subcontract Supervisor: (1 Year)

Texas Utilities Generating Co.; Glen Rose, Texas -

Administration of all QA related Subcontracts (Containment Liners, ASMETanks,HVAC).

Senior Field Engineer: -(1 Year)

' Imperial Government of Iran; Chahbahar, Iran -

Responsible for field engineering and planning for a naval base. j Field Engineer: (3h Years) -

I Carolina Power & Light Co.; Southport, North Carolina - l Responsible for field engineering, primarily offsite construction,  ;

at Brunswick Nuclear Power Plant.

Queen's Point Development Corp. - 1973-75 Superintendent: .

Responsible for construction of 50 homes per year. Duties included construction, purchasing, subcontracts, and land development.

May,1983

6

, }l .

riEYWARD ASGELL HUTCHINSON l i

Project Control Manager Inland Bridge Co. - 1968-69 ,

Field Engineer:

Responsible for layout and field engineering for 5000-ft. vertical lift span bridge.

South Carolina Highway Department - 1963-68 Party Chief:

Responsible for survey crew layouts of I-95 roadway and bridge construction.

I p