Text
Dnie 3
t;
- l '
[l 'f
's c'
P.o. box 5000 - CLEVELAND, OHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.
- 55 PUBLICSOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN December 21, 1983 VICE PRESIDENT NUC' EAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Restart of the Control Complex Chiller [RDC 70(83)]
Dear Mr. Keppler:
Our final report dated August 15, 1983, concerning restart of Control Room Chiller following a Loss of Of fsite Power (LOOP) or a Loss of Coolant Accident (LOCA) stated that corrective action, including design changes and the imple-mentation of the changes would be completed by March 1,1984.
We now anticipate that we will complete the design changes by March 31, 1984.
l Implementation will be complete by June 1,1984.
f Please call if there are additional questions, f
Sincerely, Murray R.
.delman Vice President Nuclear Group MRE:pab cc:
Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8401050509 831221 PDR ADOCK 05000440 S