ML20083J827

From kanterella
Jump to navigation Jump to search
Advises That Installation of First New Rack That Does Not Contain Boraflex Completed 831219,per License Condition Added to Amend 75 to License DPR-40
ML20083J827
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/30/1983
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: John Miller
Office of Nuclear Reactor Regulation
References
LIC-83-320, NUDOCS 8401100329
Download: ML20083J827 (2)


Text

i i

Omaha Public Power District 1623 Hamey Omaha, Nebraska 68102 402/536 4000 December 30, 1983 LIC-83-320 Mr. James R.

Miller, Chief U.

S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division cf Licensing Operating Reactors Branch No. 3 ilashington, D.C.

20555

Reference:

Docke t No. 50-285

Dear Mr. Miller:

Spent Fuel Pool Reracking at the Fort Calhoun Station In a letter dated September 9, 1983, the Commission issued Amendmen t No. 75 to Facility Operating Licence No. DPR-40 for Omaha Public Power District's Fort Calhoun Station.

This amendment to the license and Technical Specifications was requested as a part of the reracking of the spent fuel pool at the Fort Calhoun Station.

A license condition was added to that amendment which required that the District notify the Commission in writing within two weeks after the event as to the following:

(1)

Installation date of the first new rack that contains Boraflex (completed November 19, 1983; notified the Commission by District letter LIC-83-295 dated November 23, 1983).

(2)

Installation date of the first new rack that does not contain Boraflex.

(3)

Installation date of the last new rack.

8401100329 831230 00 gDRADOCK 05000285 PDR I

45 5124 Employment with Equal Opportunity Male / Female

3.

Mr.~ James R. Miller LIC-83-320 Page Two In 1esponse to this requirement, the District hereby noti-fie s the Commission that installation of the first new rack that does not contain Beraflex was completed December 19, 1983.

I Sincerely, Iwsu W.C.

pones Divis:.on Manager Production Operations WCJ/DJM:jmm cc:

Mr. J.

E. Gagliardo, Director Division of Resident Reactor Project

&~ Engineering Programs U.

S.

Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036 J

Mr.

E.

G. Tourigny, Project Manager Mr. L.

A. Yandell, Senior Resident Inspector l

i d-

?

t I

t

.. _ - -,.....,.. -. -