ML20083J776
| ML20083J776 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/09/1983 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| REF-SSINS-6820 IEB-83-06, IEB-83-6, NUDOCS 8401050414 | |
| Download: ML20083J776 (2) | |
Text
~
,. g DUKE POWER GOMPAhT P.O. BOX 33180 CHARLOfrTE, N.C. 28242 HALH.TUCKEP.
TELEPHONE vuom censsenwr (704) 373-453s December 9, 1983 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287 IE Bulletin 83-06
Dear-Sir:
By letter' dated November'18, 1983, Duke submitted a response to IE Bulletin 83-06 concerning non-conforming materials supplied by Tube-Line Corporation.
Attached please find Supplement 1 to the initial response which contains information which was inadvertently omitted.
Very truly yours, gk, O
Hal B.-Tucker RLG/php Attachment cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. J. C. Bryant NRC Resident Inspector Oconee Nuclear Station Mr. John F. Suermann Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 PDR I
h L
Fl
..w-
.,,,,,,.,--,,,--.-,....--.....-._,-----,---,.m,
,~,,,..,..%,.r..,-
.,,.,,,m,,_
.m,.
...-,..,,-.-.-.,--m-
6 Duke Power Company Oconee-Nuclear Station Response to IE Bulletin 83-06 Supplement 1 This supplement provides information which was inadvertently omitted from the initial response to IE Bulletin 83-06.
a.-
Provide a list of the Tube-Line supplied materials and identify the systems in which the materials are installed.
Response
'4 pcs, 8" x 4", Schedule 40, SA-234 WPB Reducing Tees Presently located in warehouse tagged with QA Hold 9 pcs, 4" Schedule 40, SA-234 WPB Long Radius 90' ELLS 3 pcs. presently located in warehouse tagged with QA Hold 6 pcs. installed in non-safety applications b.-
Response
Presently, final disposition of these items is still under evaluation.
However, unless these items can be confirmed to be able to perform their intended service, they will not be used in a safety-related application.
c.
Not applicable 4
_, _ _ _ _ _. ~ _.
..