/)M C i:
s
,1.
P O. box 5000 - CLEVEL AND, oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.
- $5 PUBLICSOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN December 21, 1983 VICE PRESIDENT NUCUAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Cooling of the Reactor Core Isolation Cooling Room [RDC 72(83)]
Dear Mr. Keppler:
Our interim report dated August 16, 1983, concerning cooling of the Reactor Core Isolation Cooling (RCIC) room during a Loss of Coolant Accident (LOCA) stated that corrective action including the review of Safety Systems, design modifications, and the implementation of the modifications would be completed by March 24, 1984.
The review of Safety Systems is complete. We now anticipate that we will complete the design modifications by February 15, 1984, and inplement the modifications by May 31, 1984.
Please call if there are additional questions.
Sincerely, i
Yho 0
j PDR Murray R.
delman Vice President Nuclear Group MRE:pab cc:
Mr. M. L. Gildner NRC Site Office Directcr Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission e/o Document Management Branch Washington, D.C.
20555 Records Center, SEF-IN Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 DEC 2 71933 ZEi?ri r