ML20083G919

From kanterella
Jump to navigation Jump to search
Advises That Repsonse to IE Bulletin 80-11, Seismic Qualification of Masonry Walls, Will Not Be Transmitted Until 840201 Due to Delays in NDE of safety-related Masonry Walls
ML20083G919
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/30/1983
From: Giesler C
WISCONSIN PUBLIC SERVICE CORP.
To: Varga S
Office of Nuclear Reactor Regulation
References
CON-NRC-83-237, REF-SSINS-6820 IEB-80-11, NUDOCS 8401040378
Download: ML20083G919 (1)


Text

__ - __ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ - _ _ _ _ _ .

NRC-83-237 WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 December 30, 1983 Director of Nuclear Reactor Regulation Attention: Mr. S. A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing l

U. S. Nuclear Regulatory Commission i Washington, D. C. 20555 1

Dear Mr. Varga:

(

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant IE Bulletin 80-11 " Seismic Qualification of Masonry Walls"

References:

1) Letter from C. W. Giesler to S. A. Varga dated June 30, 1983
2) Letter from C. W. Giesler to S. A. Varga dated April 29, 1983 Reference 1 stated our intentions to re-initiate our program to respond to IE Bulletin 80-11 and contained the comitment date of January 1,1984 for the transmittal of a final report.

In Reference 2 we commited to a non-destructive examination of safety related masonry walls to verify proper installation. The non-destructive examination has taken more time than anticipated, therefore, we must revise our response date for transmittal of our report to February 1, 1984.

Very truly yours, '. 8401040378 831230 PDR G

ADOCK 05000305 PDR C. W. Giesler Vice President - Nuclear Power //

JSG:jks #

cc - Mr. Robert Nelson, US NRC Dir., Office of Inspection and Enforcement US NRC, Washington, D.C. 20555

- - _ _ _ - _ _ _ _ - _ _ _ - _ _ _ _ _ _ _