Interim Deficiency Rept DER 83-49 Re Diffuser Bolts Broken Loose in Reactor Coolant Pump File.Initially Reported on 830715.Final Rept Will Not Be Complete Until 840127
ML20083G366
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/29/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28313-BSK, DER-83-49, NUDOCS 8401040222
Download: ML20083G366 (2)


Text

_

IICEIVED t:EC Arizona Public Service Company P O BOX 21666 o PHOENIX. ARIZONA 8';O36 Nove h b N 9k3 bb ANPP-28313-BSK/KCP i:EGl3 M F U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 l

W inut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director, 3

Division of Resident, l

Reactor Projects and Engineering Programs

]

Subject:

Time Extension for Report - DER 83-49 A 50.55(e) Potentially Reportable Condition Relating To Diffuser Bolts Broken / Loose In Reactor Coolant Pump File: 83-019-026; D.4.33.2

Reference:

( A) Telephone Conversation between P. Narbut and R. Tucker on July 15, 1983.

j (B) ANPP-27593, dated August 19, 1983 (Interim Report)

Dear Sir:

'Ine NRC was notified of a potentially reportable deficiency in l

l Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by November 29, 1983.

Due to the extensive investigation and evaluation required, it is now 4

expected that this information will be finalized by January 27, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yourog l

1 Ch n aA E. E. Van Brunt, Jr.

APS Vice President,

Nuclear Projects Management ANPP Project Director l

EEVBJr/KCP:ru cc: See Page 2 8401040222 831129 PDR ADOCK 05000528 S

PDR 3L N ih

-www..

r,--

.y--,.. - - _ _. - _ _, _.,. _ _, _ _ _

_3.,,_,

,_._.,__,,7._

y.

9 s.

1 Mr. T. W. Bishop DER 83-4 9 Page 2 cc:

Richard DeYoung Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339