Interim Deficiency Rept DER 83-59 Re IEEE-384 Separation Criteria Violation in post-accident Control Room Cabinet & Safety Radiation Monitoring Cabinet.Initially Reported on 830830.FSAR Change Notice to Be Issued.Final Rept by 840330
ML20083G125
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/30/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28312-BSK, DER-83-59, NUDOCS 8401040129
Download: ML20083G125 (3)


Text

g

'T RECEIVED" f!CC Anzona Public Service Company Po BOX 21666

  • PHOENIX. art 2ONA 85036

!?.3 DEC -9 #110- 50, November 30, 1983 ANPP-28312-BSK/KCP BEGiGH Vni; U.S. Nuclear Regulatory Commission Region V Creekcide Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. T. W. Bishop, Director Division of Resident

)-

Reactor Projects and Engineering Programs

Subject:

Interim Report - DER 83-59 A 50.55(e) Potentially Reportable Deficiency Relating to IEEE-384 Separation Criteria Violated By Wiring In Unit 2 Post-Accident Control Room Cabinet And Safety Radiation tionitoring Cabinet File:

83-019-026, D.4.33.2 Re f ere nce :

( A) Telephone Conversation between P. Narbut and R. Tucker on

+

August 30, 1983 (B) ANPP-27912, dated October 3, 1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). At that 1

time, it was estimated that a Final Report would be available by November 29, 1983.

Due to the extensive investigation and evaluation required, an Interim Report - Revision 1 is attached.

It is now expected that this information will be finalized by March 30, 1984, at which time a complete report will be submitted.

Very truly yours, l

0Q i t.Outl m C-C.

ch 8401040129 831130 gDRADOCK 05000529 E. E. Van Brunt, Jr.

PDR APS Vice President Nuclear Projects Management ANPP Project Director l

EEVBJr/KCP:ru Attachment cc: See Page 2 V 7'7 s \\

s T. W. Bishop D ER 83-5 9 Interim Report - Revision 1 Page 2 cc:

Richard DeYoung, Director Of fice of Inspection and Enf orcement U.

S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Wo od s, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Id e J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bi ngham R. L. Patterson R. W. Welcher R. M. Grant D. R. !'oukinson L. E. Vorderbrueggen G. A. Florelli S. R. Frost J. Self D. Canady l

Records Center l

Institute of Nuclear Power Operations l

1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 l

l l

l l

l l

l

f

.g.

INTERIM REPORT - Revision 1 - DER 83-59 POTENTIAL REPORTABLE DEFICIENCY ARIZONI. PUBLIC SERVICE COMPANY ( APS)

PVNGS UNIT 2 I.

POTENTIAL PROBLEM Inspection of Unit 2, Safety Radiation Monitoring Cabinets (Tag No's 2J-SQA-C01 and 2J-SQB-C01) revealed that internal wiring is not in conformance with Class 1E separation requirements as defined in IEEE-384.

Inspection of Unit 2, Post Accident Radiation Monitoring Cabinets (Tag No's 2J-SQA-C05 and 2J-SQB-C05) revea?.ed that internal wiring is not in conformance with Class IE separation requirements as defined in IEEE-384.

Inspection of Unit 2, Safety Radiation Monitor Cabinets (Tag No.'s 2J-SQA-C01)

Both cabinets were supplied by Kaman Instrumentation Corporation.

II.

APPROACH TO AND STATUS OF PROPOSED RESULUTION Bechtel Engineering has reviewed the Kaman field representative's recommendations for corrective action with regard to re-routing cable runs and providing metal barriers between the appropriate terminal blocks to conform uith the Class IE raceway and cable separation criteria.

However, the remaining part of the corrective action requires an exception to NUREG 1.75 for low voltage computer information cables. This will require a FSAR Change Notice to be issued.

It is expected that FS AR Change Notice No. 1114 will be issued will be issued by mid-March of 1984.

III. STATUS OF CORRECTIVE ACTION The complete evaluation and Final Report are forecast to be completed by March 30, 1984.