Responds to Generic Ltr 83-41, Fast Cold Starts of Diesel Generators, Providing Data on Number of Fast Cold Starts from Dec 1982 to Dec 1983.Increased Testing Frequency Inappropriate
ML20083G060
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/04/1984
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
GL-83-41, NUDOCS 8401100469
Download: ML20083G060 (1)


Text

l l%sconsm Bectnc macome 231 W. MICHIGhN, P.O. BOX 2046. MILWAUKEE, WI 5.01 January 4, 1984 Mr. H. R.

Denton, Director Office of Nuclear Reactor Regulation U.

S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Attention:

Mr.

D. G.

Eisenhut, Director Division of Licensing Gentlemen:

DOCKET NOS. 50-266 AND 50-301 RESPONSE TO GENERIC LETTER NO. 83-41 FAST COLD STARTS OF DIESEL GENERATORS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 The following is Wisconsin Electric Power Company's response to the questions and concerns raised in Generic Letter No. 83-41, " Fast Cold Starts of Diesel Generators", which was forwarded by Mr. D. G. Eisenhut's letter dated December 16, 1983.

During the period December 1, 1982 to December 1, 1983 each of our two emergency diesels was subjecced to the following number of fast cold starts:

1.

Surveillance testing - 1.

2.

Maintenance activities - 1.

3.

Actual demands - 0.

We feel that since the emergency diesel generators are required to " fast cold start" during certain emergencies, it is appropriate to perform an annual fast cold start test.

However, frequent tests would definitely degrade their reliability and availability.

Therefore, although it may be necessary on occasion, fast cold starts of the diesel generators should be avoided whenever possible.

Very truly yours, L,g (j.

B401100469 840104 PDR ADOCK 05000266 P

PDR

/

Vice President-Nuclear Power 0l C. W. Fay Copy to NRC Resident Inspector