s 3,3.g " ^^;
n".,
Arizona Public Service Company P O BOX 21666 + PHOENI A. ARIZONA 85036 v-,
n-n December 8,1983s ; 10 fil 3: 2c ANPP-28392-BSK/KCP E! ^l.:l; y;; :
U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director, Division of Resident, Reactor Projects and Engineering Programs Su bject :
Time Extension for Report - DER 83-32 A 50.55(e) Potentially Reportable Condition Relating To Socket Welds In Unit 1 Steam Generator Process Piping Are In Violation of Requirements.
File:
83-019-026; D.4.33. 2
Reference:
(A) Telephone Conversation between T. Young and R. Tucker on May 2 5, 1983.
(B) ANPP-24171, dated June 24, 1983 (Interim Report)
(C) ANPP-27522, dated August 5, 1983 (Time Extension)
(D) ANPP-28094, dated October 26, 1983 (Time Extension)
Dear Sir!
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C) and (D).
At that tima, it was estimated that a Final Report would be available by December 7, 1983.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by January 13, 1983, at which time a complete report will be submitted.
There is no new information or change to the Interin Report at this time.
k Very truly ours g.c CLLL (
O LLC d
0312300109 831208 PDR ADOCK 03000528 E. E. Van Brunt, Jr.
S PDR APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr/KCP:ru cc: See Page 2 l}N (; }l
-. - -. _ =.
a i
Mr. T. W. Bishop DER 83-32 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers
- B. S. Kaplan s
W. E. Id e J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. H. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli i
S. R. Frost J. Self D. Canady a
Records Center i
Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 1
m.
,,--.m
-.,..e-,-a,
,e r-,e
---,-.-.,-r,-,--,,
-,m.-,.
.,.,..m,..<,
,.w.-m-,n-.m,.,-,
-.,--n-,
-- ve. ~
-,wenv n-m- - - ~..-r-,