Forwards Revised Positions in Response to 831115 Request for Addl Info Re Commitments to Reg Guides 1.58 & 1.146 Re QA Program.Util Will Retain Option to Deviate from ANSI Std Recommendations for Experience Levels
ML20083E519
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/21/1983
From: Geier J
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.058, RTR-REGGD-01.146, RTR-REGGD-1.058, RTR-REGGD-1.146 0950-L, 950-L, L11-83(12-21)-L, L11-83912-21)-L, U-0684, U-684, NUDOCS 8312290253
Download: ML20083E519 (3)


Text

_ -

i U- 0684 0950-L fil/N0/8 POWER COMPANY gg3y 713_g3q7g_g7y_t 500 SOUTH 27TH STREET. DECATUR,ILUNOIS 62525 Docket No. 50-461 December 21, 1983 Director of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

Clinton Power Station Unit 1 Regulatory Guides 1.58 and 1.146

Dear Mr. Schwencer:

This is in response to the request for additional information in your letter of November 15, 1983 regarding commitments to the subject regulatory guides.

The attachment provides the revised Illinois Power Company positions on compliance to Regulatory Guides 1.58 and 1.146.

Should you have any questions concerning this material, we would be pleased to discuss them with you.

Sincerely yours, NE J. D. Geier Manager Nuclear Station Engineering GEW/ lim Attachment cc:

G. A. Harrison, NRC Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety 0

8312290253 831221 PDR ADOCK 05000461 I

A PDR I

Attachment to IP letter U- 0684 dated 12/21/03 1.

ANSI N45.2.23 (1978)

Regulatory Guide 1.146, Rev. 0 (August, 1980)

Position The Illinois Power Company Quality Assurance Program is presently in full compliance with ANSI N45.2.23 (1978) and Regulatory Guide 1.146 as committed to in the Clinton Power Station FSAR (Section 1.8, page 1.8-153a, Amendment 14, March 1982).

CPS-FSAR page 1.8-153a will be revised at the earliest amendment opportunity to delete the clarification note which committed IP to full implementation 90 days prior to fuel load.

Commitment Change Compliance to ANSI N45.2.23 (1978) and Regulatory Guide 1.146 as clarified in the FSAR is changed from 90 days prior to fuel load to December 15, 1983.

2.

ANSI N45.2.6 (1978)

Regulatory Guide 1.58, Rev. 1 (September 1980)

Position The Illinois Power Company Quality Assurance Program is in full compliance with ANSI N45.2.6 (1978) and Regulatory Guide 1.58 (Rev. 1) as described in the Clinton Power Station FSAR (Section 1.8 pages 1.8-64 and 1.8-64a, Amendment 14, March 1982).

All personnel certified to ANSI N45.2.6, Levels I, II and III hold a high school education or a GED equivalent of a high school diploma.

Regulatory Guide 1.58, Position C.6, contains an NRC position that if no alternative to the education and experience requirements of Position C.6 is provided, recommendations of the ANSI Standard will be followed.

The IP Qualit1 Program has not deviated from the ANSI Standard recommendation for education levels in certifying personnel to ANSI N45.2.6 (1978).

IP will retain the option to deviate from the ANSI standard recommendation for experience levels as an option to Position C.6 of Regulatory Guide 1.58.

Experience deviations will be granted in incidences where education, technical experience, test results or past performance justifies a deviation approval.

Experience deviations will only be approved by department / organization Managers or designees with the IP Manager - QA being advised of all experience deviations authorized at CPS.

Attachment to IP letter U 0684 dated 12/21/83 CPS-FSAR pages 1.8-64 and 1.8-64a will be revised at the earliest amendment opportunity to delete the clarification note which committed IP to full implementation 90 days prior to fuel load and to revise the exception to position C.6.

Commitment Change Compliance to ANSI N45.2.6 (1978) anu Regulatory Guide 1.58 (Rev. 1) as clarified in the FSAR is changed from 90 days prior to fuel load to December 15, 1983.

The exception to position C.6 will be revised as follows to establish an alternate position to the recommended experience levels of ANSI N45.2.6 (1978).

Exception to Paragraph C.6 The experience recommendations specified in Section 3.5 of the ANSI standard will not be treated as absolute when other factors provide assurance that a person can competently perform a particular task.

Candidates may be qualified using other factors such as education background, technical experience and satisfactory completion of performance or capability testing in lieu of the recommended experience requirements.

Proficiency and capability testing programs are formally documented and the qualification certifications identify the basis for qualifications.

Experience waivers will be approved by department / organization managers /

designee.

The Quality Assurance organization is advised when qualification waivers are approved in lieu of the recommended experience requirements.

.