U- 0683 ILLINDIS POWER COMPANY 0902-L fjp M50-83 (L 21)-L m 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 Docket No. 50-461 December 21, 1983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Clinton Power Station Unit 1 Questionnaire - Facility Staffing Survey

Dear Mr. Schwencer:

Attached is the subject questionnaire completed by Illinois Power Company for the Clinton Power Station per the request in the telecopy of December 6, 1983 from Mr. G. A. Harrison, NRC Clinton Licensing Project Manager.

In order to understand this summary the following clcrifications are provided:

1) The experience data reported in this summary is for those people who have been hired by Illinois Power Company.

Future personnel changes could change the data prior to the receipt of license.

2) The number of shifts, number of ROs, number of SROs and particular qualifications listed in this summary are not to be interpreted as commitments.

The FSAR lists the minimum personnel qualifications committed to by Illinois Power Company.

3) The summary does not allow space for reporting the number of associates degrees held by shift operations personnel. At this tine this number is twelve technical associates degrees and 2 non-technical associates degrees.
4) Approximately 15 of the senior shift personnel participated in a series of company sponsored technical courses. This series consisted of 12 University of Illinois math, and engineering courses; plus 3 physics courses from Richland Community College. Eight of the University of Illinois courses were taught at the advanced undergraduate level; the remaining four were taught at the introductory level.

Topics covered included Thermodynamics, Radiation Protection, Radiochemistry, Materials, Instrumentation and Heat Transfer.

8312290166 831221 PDR ADOCK 05000461 A00 IJ A PDR ,1

)

I

l i

Mr. A. Schwencer U- 0683 Page #2.

M50-8 3 ( 12- 21) -L i

Should you have any. questions concerning this material, we would be pleased to discuss them with you.

Sincerely yours, J. D. Geier Manager l, Nuclear Station Engineering GEW/ lim 1

Attachment cc: G. A. Harrison, NRC Clinton Licensing Project Manager NRC Resident Office

, Illinois Department of Nuclear Safety 1

1 t

4 4

1

Sheet 1 of 6 FACILITY STAFFING SURVEY PLANT Clinton Power Station ANTICIPATED LICENSING DATE 1/86 A. OPERATING SHIFT

1. No. of Shifts 6
2. No. of R0s Assigned to Shift Work ffi, No. of Yrs. of Commercial RO experience on BWR PWR Hot plants (post-initial criticality) U" U~
3. No. of SROs Assigned to Shift Work 18 3 previously licensed No. of Yrs of Commercial RO experience on BWR PWR Hot plants T T No. of. Yrs of. Commercial SRO experience on BWR PWR Hot plants l'.4 T
4. No. of SR0s with 4-yr degrees Non-engineering Engineering 0 8 5, No. of Shift Supervisors (SS) Non-engineering Engineering 0 0 Note: SS is senior authority on shift work.

e I .

f Page 2 of 6 B. ON-SITE MANAGEMENT (OPERATIONS) (MAINTENANCE) ASST.

SUPV. OPERATIONS ASSISTANT ASSISTANT QA/QC OPS OPS TECH. STA SUPERVISOR PLANT MGR. PLANT MGR. PLAllT MGR. MGR SUPV. ENG.

To have license at time of OL Yes Yes Yes No Yes Yes Previously licensed RO RO/SRO SRO SRO No SRO

  • Type Plant BWR PWR PWR No. Years 3.5 7 5.5 No. Years "llot" Exp. 1.5 3 0 5.5 Degreed Yes Yes Yes Yes Yes Yes Yes Type (Discipline (s)) Phy. Eng Business Eng Mech. Eng. Personnel Met Nuc.

Nuc. Physics Nuc. Eng. Management Eng, Eng. Nuc. Eng.

MBA Level (A/B/h/D) B/M B A B/M B/M B M B Navy Experience 4 8.5 4 2G 6

  • SRO license on a TRIGA reactor (2 yrs exp)

_ __ _ . _ _ . .. - ._ .. _ . _ . _ - - . _ . . _ _ - . _ . . - . _ . _ _ _ _ _ . . ._ ___ _ . _ , _ _ . _ . s __ _ .-_ _

I i

d Page 3 of 6 4

l-CORPORATE NUCLEAR EXPERIENCE

' (i.e., "Offsite" Management)

Operator Lic. Yrs at Yrs at Other D< gree.

(if ever held) Oper. Nuc. Nuc. Support Isvels Discipline ( s)

  • Name NUC NAVY. .RO/SRO/None Stations Management Position (s/B/M/D)

Position (Yrs) ~(On-site) (Off-site)

VP

  • Professional '

Engineer by

(Executive None None 7

11 ) BWR Examination

Vice President) W.C.Gerstner None 1

i I -Div VP 24 None  % PWR 1)2 BWR BS Ceneral i

1 (Vice President) D. P. Hall i

4 j Tech Service '

Mgr. None 5 Maint. Mgr. None 4

}

I None Oper. Mgr.  :

I

?

j Asst. VP None i

! Sta. Nuc. Eng. 11 BWR Mgr. 20 Other Nuc

. (Nuc. Sta Eng. Industry Exp. BS Mechanical Dept. Mgr) J. D.,Geier None None None

's

i .

Page 4 of 6 CORPORATE NUCLEAR EXPERIENCE (i.e. .'D11 site" Management)

Operator Lic. Yrs at Yrs at Other D< gree (if ever held) Oper. Nuc. Nuc. Support Livels Position Name NUC NAVY RO/SRO/None Stations Management Position (s./B/M/D) Discipline ( s)

(Yrs) (On-site) (Off-site)

Dir. Muc.

Fuel Ser.

(Dir. Nuc.

Safety & Eng. BS Electrical Analysis) E. W. Kant None None 8 PWR 3 BWR MS Industrial Engrg.

Dir. Nuc. Lic. Position Open QC/QA Mgr. None Dir. Design BS Electrical Eng. J. S. Spencer None None None 11 BWR IC Nuclear Supv. Lic. G. E. Wuller None None None 11 BWR BS Chemistry 20 Other Nuc.

Exp.

Supv. Mech. Eng. C. C. Wheeler None SRO None 20 Gas Ret BS Chemical (Exp Cas Ret) 7 BWR

~

Page 5 of 6 CORPORATE NUCLEAR EXPERIENCE (i.e.,' 9ffsite" Management)

Operator Lic. Yrs at Yrs at Other De gree (if ever held) Oper. Nuc. Nuc. Support Lavels Position Name NUC NAVY RO/SRO/None Stations Management Position (/./B/M/D) Discipline ( s)

(Yrs) (On-site) (Off-site)

Sup'v. Civil /Str. 11. B. Perkins None None None 9 BWR BS Civil 15 Exp. Rcts.

Supv. E1 & BS Electrical Startup Eng. A. L. Ruwe None None None 9 BWR MS Nuclear Supv. Instr. BS Electrical

& Control Eng J. P. O'Brien None None None 7 BWR MS Nuclear Supv. Constr.

Eng. G.N.Motsegood None None None 11 BWR BS Mechanical Supv. Eng. BS Physics J. F. Hampton None None None 7 BWR BS Electrical Assurance Supv. Sa fe ty Mechanical Analysis J. H. Shepard None None 3 N Rct. 11 BWR BS

s r

Page 6 of 6 CORPORATE NUCLEAR EXPERIENCE (i.e. I Dfisite" Management)

Operator Lic. Yrs at Yrs at Other De gree (if ever held) Oper. Nuc. Nuc. Suppert Levels Position Name NUC NAVY RO/SRO/None Stations Management Position (n/B/M/D) Discipline ( s)

(Yrs) (On-site) (Off-site) 15 BWR Supv. Nuc. 4 BWR-on-site BS Mechanical Fuel Cycle G. S. Green None None  % PWR Pre-op testing 2 Test Rct BS Physics Supv. Tech. MS Nuclear Assessment D.L.Holtzscher None None None 11 BWR Supv. Training BS Physics D. W. Wilson None None None 11 BWR MS Nuclear (Eng)

1. W. C. Gerstner has had management responsibility for Clinton Power Station since his promotion to vice president in December 1972.
2. D. P. Hall has responsibility for the Quality Assurance, Startup, Operations, and Engineering activities for Clinton Power Station. The majority of his time is spent on-site.