ML20083D822

From kanterella
Jump to navigation Jump to search
Inservice Insp Rept,Unit 2 Catawba 1990 Refueling Outage 3
ML20083D822
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 09/16/1991
From:
DUKE POWER CO.
To:
Shared Package
ML20083D728 List:
References
NUDOCS 9110010273
Download: ML20083D822 (6)


Text

q

[vl INSERVICE INSPECTION REPORT UNIT 2 CATAWBA 1990 REFUELING OUTAGE 3 Location:

Highway 274, Newport South Carolina 29710 NATIONAL BOARD NO. 173 COMMERCIAL SERVICE DATE: AUGUST 19, 1986 Owner:

Duke Power Company 422 S. Church St.

Charlotte, NC 28201 Revision 2 Prepared By:

Nh1/2?c Date _ h- /[ ~ #'/

/

Reviewed By:

B.

Date k- /d - 9 /

m k, l

,/ T 7. L t d Dato 9 - / b

'f /

Approved By:

Copy No.

5 Assigned To NRC Document Control ControHed X

Uncontrolled 9110010273 910926

[DR ADOCK 050004g4 F'DR EQA298

TABLE OF CONTENTS Section Title Revision 1.

Sunn.1ary of Inservice Inspection 0

2.

Status of Required Inspections 1

3.

Final inservice Inspection Plan for Outage 3 1

4.

Results of Inspections Ferformed During Outap 3 1

5.

Class 1 Inspection Results 0

6.

Class 2 Inspection Results 0

7.

Augmented inspection Results 0

8.

Personnel. Equipment, and Material ertifications 0

9.

Problem. Investigation Reports 0

10.

Reference Documents 0

+

,11.

Class 1 and 2 Repairs and Replacements 0

- O I

e t

h I

J O

-EQA298

..m ~- -

' h

'4y Requirej inspections c.

iletimi at '

of inspections required by the 1980 ASME Section XI 4

n

'"1' 7g Am

...a through Wintur 1981, is summarized in this a-t h

.r,4 requirements are listed by the ASME Section XI examination

_ g,y as defined in Table IWB-2500-1 for Class i Inspections and in y

C-2500-1 for Class 2 Inspections.

Augmented inspections are also 0-in

.Jed.

-Q Q Class 1 Inspecti)ns jdQ ', N;I c', -

hp 4G17a Inspections Inspections Perc entage Deferral

; ffy,,: ~ -' '

_. Required Comnl.eted Completed Allowed Desc.10. ion g '.

_D are Retaining Welds 6 kelds 25%

Yes

=

We i in Reactor Vessmi p'rs t~

r. -

Pressi.re Retaining 8 Welds 3 Welds 37.50%

No Welds in Vessels 0.'her than Reactor 3

,t?)

Vessels g

B-D Full Penetration Welds 36 Inspections 12 inspections 33.33%

Partial

?(

of Nozzies in Vessels 5

B-E Pressure Retai.

Sb Welds 55 Welds 67% Credited No Partin' Penetration Welds in Vessels B-F Pressure Retaining 46 Welds 18 Welds 39.13%

No Dissimilar Metal Welds B-G-1 Prossure Retaining 466 Items 171 Items 35.69%

Yes Bolting Greater Than 2 Inch in Diameter B-G-2 Pressure Retaining

  • 63 Connuct.lons 28 Connections 41.17%

No Colting 2 Inches t.ad

i. ass in Diameter B-H Integral Attachments 9 Attachments 3 Attachments 33.33%

No Foi \\lessels

  • lotal Connections include CRDMs that are disassembled.

g Page 1 Revision i EQA298 September 16, 1991

w

,m()

Class 1 Irispections (Continued)

Section XI Inspections Inspections Percentage Deferral Category Description Required,

Completed Completed Allowed B-J Pressure Retaining 203 Walds

.! elds 43.84%

No Welds in Piping B-K-1 Integral Attachments for None N/A N/A N/A Piping, Pumps, & Valves B-L-1 Pressure Retaining Walds None N/A N/A N/A in Pump Casings B-L-2 Pump Casings Nor.e N/A N/A N/A B-M-1 Pressure Retaining l'31ds

. Welds None 0%

Yes in Valve Bodies B-M-2 Valve Body > 4 In.

7 Valves 4 Valves 57.14%

Yes Nominal Pipe Size B-N-1 Interior of Reactor 3 Items 2 Items 66.66%

No Vessel O

\\,,j-N-2 Integrally Welded Core None N/A N/A N/A Support Structures and Interior Attach rts to Reactor Vessels B-N-3 Removable Core 1 Iter None 0%

Yas Support Stiactures

=

B.

Pressure Retaining 3 Housings 1 Housing 33.33%

Yes Welds in C1ntrol Rod Housir.gs B-P All Pressure No Retaining Components System Leakage Test 160 Components 60 Components 37.50%

System Hydrostatic 20 Components O Components 0%

'est B-Q Steam Generator Tubing 100% of Technical Specifications met N/A F1.01 Class 1 Component 219 Supports 78 Supports 35.77%

No Supports I

Page 2 Revision 1 EQA298 September 16, 1991

4 f)

Class 2 Inspections x_-

Section XI Inspections Inspections Percentage Deferral Category Description

_ Required _

Completed Completed Allowed C-A Pressure Retaining 9 Welds 4 Welds 44.44%

No Welds In Pressure Vessels C-B Pressure Retaining 6 Welds 3 Welds 50%

No Nozzle Welds in Vessels C-C Integral Attachments 50 Attachments 28 Attachments 56%

No for Vessels, Piping, Pumps and Valves C-D Pressure Retaining None N/A N/A N/A Bolting Excunding 2 Inches in Diameter C-F Pressure Retaining 347 Welds 147 Welds 42.36%

No Welds in Piping f-~1 -G Pressure Retaining 25 Welds 8 Welds 32%

No ts)

Wolds in Pumps and Valves C-H All Pressure Retaining No Components System or Component 68 Components 34 Components 50%

Functional Test System Hydrostatic 92 Components O Componants 0%

Test F1.02 Class 2 Component 492 Supports 191 Supports 38.82%

No Supports t

G Page 3 Revision i EQA298 September 16, 1991

e' Augmented Inspections Description Percentage Complete Reactor Coolant Pump Flywheels 100% of Technical Specifications met S+eam Generator Tu'ces on 100% of requircments for Outages 1' 2' & 3 Preheater Section Main Steam Pipe Rupture Protection 100% of requirements for Outages 1, 2, & 3 Class 2 Piping Systems 100% of requirements for Outages 1, 2, & 3 Thermal Stress Piping 100% of requirements for Outages 2 & 3 l

A.

.-V l

l lO l

Page 4 Revision 1 EQA298 September 16, 1991

.