ML20083D784

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Use of non-Class IE Power & Control Components in Diesel Generator Bldg Ventilation Sys (Rdc 80 (83)).Initially Reported on 830816.Final Field Rewiring Expected to Be Completed by 840302
ML20083D784
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/15/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, RDC-80-(83), NUDOCS 8312280284
Download: ML20083D784 (2)


Text

='*'

Din 13 P.o. box 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG - 55 PUBUCSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE MIESIDENT NUCU AR December 15, 1983 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Use of Non-Class lE Control Power and Control Components in Diesel Generator Building Ventilation Systems (RDC 80(83) )

Dear Mr. Keppler:

This letter serves as our final report pursuant to 10CFR50.5S(e) concerning the use of Non-Class 1E power to operate cortrol devices and use of Non-Class lE control components in the circuits which provide control signals to the diesel generator building ventilation system. Mr. P. R. Pelke of your office was first notified on August 16, 1983, by Mr. E. Riley of The Cleveland Electric Illuminating Company that this problem was being evaluated. Previously we submitted an interim report on September 15, 1983.

This report contains a Description of the Deficiency, an Analysis of Safety Implications and the Corrective Action Taken.

Description of Deficiency Relays RlA and RIAA, located in the Transamerica Delaval Inc. (TDI) engine control panel, were selected as the initiating devices for the diesel generator buf] ding ventilation system. This ventilation system is safety-related.

However, the relays supplied by TDI are nonsafety-related. Since these relays are located in a section of the engine control panel that contains safety-related components, they were isolated in a safety-related enclosure by the vendor. Because the TDI drawings were not clear as to the use of these relays, Gilbert Associates, Inc. (GAI) selected contacts from relays RlA and RIAA to initiate the diesel generator building safety-related ventilation system.

The circuit in question also contains auxiliary latch relay R1 and time delay relay TD-3. Our initial analysis of this problem also indicated that these relays were selected incorrectly. Further review with the vendor indicated these relays were never intended to be used in safety-related circuits.

O Z dJQ 13 1SUD ..

f Mr. James G. Keppler December 15, 1983 Analysis of Safety Implicaticns Because the devices used to initiate the safety-related ventilation system were nonsafety-related, there is no assurance that the building ventilation system would perform its intended function during a design basis event.

Corrective Action Taken Diesel generator building ventilation start signal will be removed from relays RlA and RIAA via an Engineering Change Notice. The start signal will then be transferred to a safety-related circuit that contains only safety-related components. This will fulfill the original design intent of starting a safety-related system from a safety-related circuit.

Upon issuance of this En? aeering Change Notice, resolution of this reported deficiency will have been reached. Final field rewdring is expected to be completed by March 2, 1984.

Please call if you have additional questions.

Sincerely, I

Murray R. Edelman Vice President Nuclear Group MRE:dm cc: Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Wachington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 l Records Center, SEE-IN l Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 i