ML20083D635
| ML20083D635 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 12/14/1983 |
| From: | Baranow S STONE & WEBSTER, INC. |
| To: | Quamme D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| SWMCP-004, SWMCP-4, NUDOCS 8312280175 | |
| Download: ML20083D635 (1) | |
Text
_ _ _ _ _ _ _ _ _ _
STONE & WEBSTER MICHIGAN, INC.
P.O. box 2325. BOSTON. M AssAcHusETTs 02107 December 14, 1983 L PRINCIPAL STAFF ED *A VRA L, DPRP e;D d'>O D/RA JE Mr. D. L.Quamme km Jase AC h FA Consumers Power Company 3
r Midland Nuclear Plant fcs v pao 3500 E. Miller Road T,f hg
)
3*
Midland, Michigan 48640
,f
Subject:
Docket No. 50-329/330 Midland Plant - Units 1 and 2 Overview of the Construction Completion Program Serial No. SWMCP-004 Phase I and Phase 11 reviews of the Architectural FCR/FCNs have been i
completed and considered acceptable by CIO as meeting the requirements l
of FID-2.400 Rev. 3, Review and Resolution Program.
l l
Sampling was performed on the MPQAD 100% verification of line 9 Phase I activity and of 100% MPQAD verifications of line 15 Phase II activity of the Generic Schedule for Resolving Stop Work Orders.
l Sampling inspections were performed of controlled stick drawings at Stations 14, 48 a, b and d and 55. They were considered satisfactory
}
and acceptable.
The Hold Point established by CIO for completion of Phase II activities in the Architectural discipline has been lifted.
This letter lifting the Hold Point, confirms my conversation with Mr. N. Riechel, CPCo, on December 13, 1983.
Very truly yours, s
rM S. W. Baranow Program Manager SWB/fs cc:
JGKeppler, US NRC Glen Ellyn, IL AJHarrison, US NRC Glen Ellyn, IL RJCook, US NRC Midland (site)
RAWells, CPCo Midland (site)
RBKelly, S&W APAmoruso S&W 0
g