ML20083D054
| ML20083D054 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/16/1995 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Atlantic City Electric Co, Delmarva Power & Light Co, PECO Energy Co, Public Service Electric & Gas Co |
| Shared Package | |
| ML20083D056 | List: |
| References | |
| DPR-44-A-201, DPR-56-A-204 NUDOCS 9505240133 | |
| Download: ML20083D054 (8) | |
Text
.___-
,., 6
+.:
a ue UNITED STATES -
j
-j NUCLEAR REGULATORY COMMISSION 1
2 WA5HINGTON. D.C. 20066-0001
)
...../
PECO ENERGY CONPANY l
PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY j
ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277
'E PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 i
i AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 201 License No. DPR-44 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The ap>11 cation for amendment by PECO Energy Company, et al. (tie licensee) dated August 3, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter 1.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health or safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:
i 9505240133 950516 PDR ADOCK 05000277 i
P PDR
~
(I 6
. (2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 201, are hereby incorporated in the license.
PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license ' amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY Com ISSION h i F. Stolz, Director PrJectDirectorateI-vision of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications 1
Date of Issuance: May 16, 1995
s ATTACHMENT TO LICENSE AMENDMENT NO. 201 FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 Replace the following lages of the Appendix A Technical Specifications with the enclosed pages. Tie revised areas are indicated by marginal lines.
Remove f Insert 234b 234b
4' Unit 2 L!MITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS v
4.11.D.3
[
Visual inspection of snubbers required to be operable under the provisions of 3.11.D.1 shall verify that 1) there are no indications of damage or impaired operability, 2) attachments to the foundations or supporting structure are functional, and 3) fasteners for the attachment of the snubber to the component and to the snubber anchorage are functional.
Snubbers which appear to be inoperable as a result of visual inspections shall be classified as unacceptable and may be reclassified acceptable for the purpose of establishing the next visual inspection interval, providing that 1 the cause of the rejection is clearly) established and remedied for that particular snubber and for other generically susceptible snubbers; and 2) the affected snub >er is functionally tested in the as found condition and determined operable per Specification 4.11.D.7 or 4.ll.D.8, as applicable. All snubbers found connected to an inoperable common hydraulic fluid reservoir shall be counted as unacceptable for determining the next inspection interval. A review and evaluation shall be performed and documented to justify continued operation with an unacceptable snubber.
If continued operation cannot be justified, the snubber shall be declared inoperable and the Limiting Conditions for Operation shall be met.
4.11.D.4 Functional Test a) Once each operating cycle, during shutdown, a representative sample of 10%
of each type of (mechanical or hydraulic) snubber required to be operable under the provisions of 3.11.D.1 shall be functionally tested either in place or in a bench test. For every unit found to be inoperable an additional 10% of that type of snubber shall be functionally tested until no more failures are found or all snubbers of that type have been tested. The functional test requirements for mechanical
-234b-Amendment No. 10!, 107, 17!, 179 201
.,n...,-
5' A
f i
G REQ j
UNITED STATES i
j NUCLEAR REGULATORY COMESSION
\\..... /*
WASHINGTON, D.C. 2000H001 PEC0 ENERGY COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT N0. 3 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No. 204 License No. DPR-56 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The ap:11 cation for amendment by PECO Energy Company, et al. (tie licensee) dated August 3, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Connission's rules and regulations set forth in 10 CFR Chapter 1.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health or safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:
. (2) Technical Snecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 204, are hereby incorporated in the license.
PECO shall operate the facility in accoruance with the Technical Specifications.
3.
This license ' amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMISSION r
i o i F. Stolz, Director r ject Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: May 16, 1995
i i
ATTACHMENT TO LICENSE AMENDMENT NO. 204 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginal lines.
Remove /
Insert 234b 234b l
C Unit 3 LIMITING CON 0!TIONS FOR OPERATION SVRVEILLANCE REQUIREMENTS o-4.11.D.3 Visual inspection of snubbers required to be operable under the provisions of 3.11.D.1 shall verify that 1 there are no indications of damage or )mpaired i
operability, 2) attachments to the foundations or supporting structure are functional, and 3) fasteners for the -
attachment of the snubber to the component and to the snubber anchorage are functional.
Snubbers which appear to be inoperable as a result of visual inspections shall be classified as unacceptable and may be reclassified acceptable for the purpose of establishing the next visual inspection interval, providing that 1) the cause of the rejection is clearly established and remedied for that particular snubber and for other generically susceptible snubbers; and 2) the affected snubber is functionally tested in the as found condition and determined operable per Specification 4.11.D.7 or 4.11.D.8, as applicable. All snubbers found connected to an inoserable common hydraulic fluid reservoir s tall be counted as unacceptable for determining the next inspection interval. A review and evaluation shall be performed and documented to justify continued operation with an unacceptable snubber.
If continued operation cannot be justified, the snubber shall be declared inoperable and the Limiting Conditions for Operation shall be met.
4.11.D.4 Functional Test a) Once each operating cycle, during shutdown, a representative sample of 10%
of each type of (mechanical or hydraulic) snubber required to be operable under the provisions of 3.11.D.1 shall be functionally tested either in place or in a bench test.
For every unit found to be inoperable an additional 10% of that type of snubber shall' be functionally tested until no more failures are found or all snubbers of that type have been tested. The functional test requirements for mechanical
-234b-knendment No. 703, III,175, IS2, 204
._y
-