Requests That CA Public Util Commission (Cpuc) Relieve CA Energy Co (Cal Energy) & Luz Intl of Any Cost Responsibility for Expenditures Incurred in Const of Transmission LineML20083C936 |
Person / Time |
---|
Site: |
San Onofre |
---|
Issue date: |
05/16/1995 |
---|
From: |
SOUTHERN CALIFORNIA EDISON CO. |
---|
To: |
CALIFORNIA, STATE OF |
---|
References |
---|
NUDOCS 9505230112 |
Download: ML20083C936 (3) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P7111999-10-26026 October 1999 Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196K6721999-07-0202 July 1999 Discusses 990628 Meeting Conducted in Region IV Office Re Status of San Onofre Nuclear Generating Station Emergency Preparedness Program.List of Attendees & Licensee Presentation Encl 1999-09-03
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20216H7321997-09-10010 September 1997 Ack Receipt of Disagreeing W/Some Conclusions Stated in from NRC in Response to .Nrc Has Exclusive Jurisdictional Authority Over Discharge of Radioactive Wastes & Seismic Safety at SONGS ML20117M5461996-08-27027 August 1996 Requests Authorization for Matl Change in Discharge of SONGS Units 2 & 3.Effluent Limits & Monitoring Requirements for Chemical Metal Cleaning Wastewater at Station,Encl ML20086B2361995-06-22022 June 1995 Forwards Notice of Filing Application in Listed Proceeding, a 95-05-049 Re Energy Cost Adjustment Clause Application (U 338-E) of Sce,For Filing W/Ca Public Utilities Commission ML20083C9361995-05-16016 May 1995 Requests That CA Public Util Commission (Cpuc) Relieve CA Energy Co (Cal Energy) & Luz Intl of Any Cost Responsibility for Expenditures Incurred in Const of Transmission Line ML20062J8311993-11-10010 November 1993 Forwards Certificate of Service of Notice of Filing Application of SCE (U 338-E) for Filing W/Commission,Per Rule 24 of Commission Rules of Practice & Procedure ML20039E3631981-12-24024 December 1981 Requests Insp Rept Carried Out Under Condition 2 of Nuclear Energy Liability Policy for Facilities.Opposes Licensing ML18086B6961981-03-26026 March 1981 Ack Receipt of Recent Correspondence Re Licensing of Facilities.Formal Response & Clarification of Issues Forthcoming ML18086B6981981-03-20020 March 1981 Supports Licensing of Facilities ML19283B6161979-01-31031 January 1979 Confirms 790207 Deposition of R Carstens,Changing 790104 Notice,To Continue Day to Day Until Completed ML19270F4561979-01-16016 January 1979 Confirms Time,Place & Date to Take Deposition of Ron Carstens 1997-09-10
[Table view] |
Text
-
W93 (h 4 y 3A NOTICE OF FILING j POSSIBLE REVENUE INCREASE ,
DUE TO CONSTRUCTION OF TRANSMISSION LINE TO SERVE INDEPENDENT POWER PRODUCERS The California Public Utilities Commission (CPUC) previously authorized Edison to construct a transmission line to deliver power generated by two independent power producers, Luz International (Luz) and California Energy Company (Cal Energy). ,
The CPUC found the maximum reasonable cost of the proposed project to be !
$50.3 million. The CPUC required that Cal Energy pay 21% of the cost of the :
proposed project and that Luz pay 45% of the cost of the proposed project.
Remaining costs would be borne by our customers after completion of the project.
Following initiation of construction, the project was abandoned because we determined that the transmission line would not be needed by the independent power producert. We are now requesting that the CPUC relive Cal Energy and Luz of any cost responsibility for the expenditures incurred in the construction of the ,
transmission line. Specifically, we ask that our customers pay for $17.3 million in costs incurred to construct the abandoned transmission line project.
HOW THESE PROPOSALS MIGHT AFFECT CUSTOMER RATES The rate change for each customer class resulting from this proposal will be determined in another proceeding, known as Edison's Energy Cost Adjustment ,
Clause (ECAC). In the ECAC, requests for all revenue changes, both increases and decreases, from various proceedings are consolidated. If the CPUC were to allocate the revenue increases discussed above on a system-average percentage-change basis, the following changes would result:
Proposed Revenue Chango Customar Classes ($ Million) IS)
Domestic (Residential) 6.5 0.2 Lighting - Small and Medium Power 6.5 0.2 Large Power 3.7 0.2 Agricultural and Pumping 0.5 0.2 Street and Area Lighting (L1 0.1 TOTAL 17.3 0.2 9505230112 950516 4<. L PDR ADOCK 05000361 .I t P PDR 1 p
y ..
1 THE CPUC WELCOMES YOUR PARTICIPATION AND COMMENTS The CPUC will conduct an evidentiary hearing on the transmission line request in at 10:00 a.m. on June 8,1995, at the CPUC's Hearing Room at 505 Van Ness Avenue, San Francisco, California.
At the hearings, Edison representatives, interested parties, and the CPUC's !
Division of Ratepayer Advocates (DRA) will present testimony. DRA engineers, l accountants, economista, attorneys, and other professionals independently evaluate I utility rate increase proposals and present their analyses and recommendations to the CPUC at evidentiary hearings. The rates approved may differ from those' Edison has requested. ,
If you need advice on how to participate or wish to make comments to the CPUC, please write to:
The Public Advisor California Public Utilities Commission 107 South Broadway, Room 5109 Los Angeles, CA 90012 If you have a question or need further information, please state in your letter that you would like a response; otherwise no reply will be sent. The Public Advisor will give your letter to the Commissioners and it will become part of the formal file.
Please mention that you are writing about Application No. 89-03-026.
Complete copies of this application may be inspected at the Edison or CPUC offices listed below.
SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Rosemead, CA 91770 OFFICES OF THE CPUC State Building State Building 505 Van Ness Avenue 107 South Broadway, Room 5109 San Francisco, CA 94102 Los Angeles,CA 90012
i
. v -
.o .
4-If you wish further information from Edison about this matter, please write to: 1 Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Attention: Owens F. Alexander, Jr. >
Vice President l
)
l l