Requests That CA Public Util Commission (Cpuc) Relieve CA Energy Co (Cal Energy) & Luz Intl of Any Cost Responsibility for Expenditures Incurred in Const of Transmission Line
ML20083C936
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/16/1995
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
CALIFORNIA, STATE OF
References
NUDOCS 9505230112
Download: ML20083C936 (3)


Text

-

W93 (h 4 y 3A NOTICE OF FILING j POSSIBLE REVENUE INCREASE ,

DUE TO CONSTRUCTION OF TRANSMISSION LINE TO SERVE INDEPENDENT POWER PRODUCERS The California Public Utilities Commission (CPUC) previously authorized Edison to construct a transmission line to deliver power generated by two independent power producers, Luz International (Luz) and California Energy Company (Cal Energy). ,

The CPUC found the maximum reasonable cost of the proposed project to be  !

$50.3 million. The CPUC required that Cal Energy pay 21% of the cost of the  :

proposed project and that Luz pay 45% of the cost of the proposed project.

Remaining costs would be borne by our customers after completion of the project.

Following initiation of construction, the project was abandoned because we determined that the transmission line would not be needed by the independent power producert. We are now requesting that the CPUC relive Cal Energy and Luz of any cost responsibility for the expenditures incurred in the construction of the ,

transmission line. Specifically, we ask that our customers pay for $17.3 million in costs incurred to construct the abandoned transmission line project.

HOW THESE PROPOSALS MIGHT AFFECT CUSTOMER RATES The rate change for each customer class resulting from this proposal will be determined in another proceeding, known as Edison's Energy Cost Adjustment ,

Clause (ECAC). In the ECAC, requests for all revenue changes, both increases and decreases, from various proceedings are consolidated. If the CPUC were to allocate the revenue increases discussed above on a system-average percentage-change basis, the following changes would result:

Proposed Revenue Chango Customar Classes ($ Million) IS)

Domestic (Residential) 6.5 0.2 Lighting - Small and Medium Power 6.5 0.2 Large Power 3.7 0.2 Agricultural and Pumping 0.5 0.2 Street and Area Lighting (L1 0.1 TOTAL 17.3 0.2 9505230112 950516 4<. L PDR ADOCK 05000361 .I t P PDR 1 p

y ..

1 THE CPUC WELCOMES YOUR PARTICIPATION AND COMMENTS The CPUC will conduct an evidentiary hearing on the transmission line request in at 10:00 a.m. on June 8,1995, at the CPUC's Hearing Room at 505 Van Ness Avenue, San Francisco, California.

At the hearings, Edison representatives, interested parties, and the CPUC's  !

Division of Ratepayer Advocates (DRA) will present testimony. DRA engineers, l accountants, economista, attorneys, and other professionals independently evaluate I utility rate increase proposals and present their analyses and recommendations to the CPUC at evidentiary hearings. The rates approved may differ from those' Edison has requested. ,

If you need advice on how to participate or wish to make comments to the CPUC, please write to:

The Public Advisor California Public Utilities Commission 107 South Broadway, Room 5109 Los Angeles, CA 90012 If you have a question or need further information, please state in your letter that you would like a response; otherwise no reply will be sent. The Public Advisor will give your letter to the Commissioners and it will become part of the formal file.

Please mention that you are writing about Application No. 89-03-026.

Complete copies of this application may be inspected at the Edison or CPUC offices listed below.

SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Rosemead, CA 91770 OFFICES OF THE CPUC State Building State Building 505 Van Ness Avenue 107 South Broadway, Room 5109 San Francisco, CA 94102 Los Angeles,CA 90012

i

. v -

.o .

4-If you wish further information from Edison about this matter, please write to: 1 Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Attention: Owens F. Alexander, Jr. >